X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124221208000

Well Details

Well ID: 0124221208000
Loading map...
Location: 00/08-12-012-22W4/0
Location Alias: 00/08-12-12-22 W4M
Location Alias 2: 00/08-12-012-22 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 22
Section: 12
County/Municipality: Lethbridge County
Well Name: HOUSTON KEHO 8-12-12-22
Operator Name: Houston Oil & Gas Ltd.
License Number: 0092476
License Date: 1981-09-29
License Status: Suspension
Spud Date: 1981-09-30
Final Drill Date: 1981-10-04
Well Total Depth: 1091.00 m
Surface Hole Latitude: 49.981919
Surface Hole Longitude: -112.875443

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-29 Obtained License
1981-10-04 Finished Drilling
1981-10-06 Production Casing Operation Performed
1981-10-06 Well Mode changed to Drilled and Cased
1981-10-08 Perforation Treatment Performed - Jet Perforation
1981-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-26 Well Began Production
1987-05-26 Well Fluid changed to Gas
1987-05-26 Well Mode changed to Flowing
1994-05-21 Perforation Treatment Performed - Cement Squeeze
1994-05-21 Plug Back Performed
1994-05-21 Well Fluid changed to Gas
1994-05-21 Well Mode changed to Suspended
1997-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-07 Perforation Treatment Performed - Fractured
1997-07-07 Perforation Treatment Performed - Jet Perforation
1997-07-07 Plug Back Performed
1997-07-07 Well Fluid changed to Gas
1997-07-07 Well Mode changed to Abandoned Zone
1997-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-08 Perforation 1055.50 1058.00 12
1981-10-11 Acid Treatment 1055.50 1058.00 0
1994-05-21 Cement Squeeze 1055.50 1059.00 0
1997-07-07 Packing Device Capped w/Cement 1079.00 1087.00 0
1997-07-07 Perforation 1055.50 1058.00 18
1997-07-07 Fracture 1055.50 1058.00 0
1997-07-11 Packing Device Capped w/Cement 1042.00 1050.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1448 0.0 0.0 0.0
1988 6634 0.0 0.0 0.0
1989 8039 0.0 0.0 0.0
1990 7981 0.0 0.0 0.0
1991 7946 0.0 0.0 0.0
1992 6577 0.0 0.0 0.0
1993 5559 0.0 0.0 0.0
1994 1457 0.0 0.0 0.0

For data sources see[5]

References