X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114141306000

Well Details

Well ID: 0114141306000
Loading map...
Location: 00/06-13-011-14W4/0
Location Alias: 00/06-13-11-14 W4M
Location Alias 2: 00/06-13-011-14 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 14
Section: 13
County/Municipality: Municipal District of Taber
Well Name: HAREX GRDFKS 6-13-11-14
Operator Name: Devon Canada Corporation
License Number: 0061530
License Date: 1976-12-07
License Status: RecCertified
Spud Date: 1977-01-24
Final Drill Date: 1977-01-28
Well Total Depth: 917.10 m
Surface Hole Latitude: 49.909747
Surface Hole Longitude: -111.793296

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-07 Obtained License
1977-01-28 Drill Stem Test Performed
1977-01-28 Finished Drilling
1977-01-28 Well Mode changed to Drilled and Cased
1977-01-29 Kick Occurred
1977-01-30 Production Casing Operation Performed
1977-02-01 Perforation Treatment Performed - Open-Hole Completion
1977-02-02 Perforation Treatment Performed - Jet Perforation
1977-02-11 Well Began Production
1977-02-11 Well Fluid changed to Crude Oil
1977-02-11 Well Mode changed to Pumping
1977-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-12 Perforation Treatment Performed - Fractured
1978-06-02 Perforation Treatment Performed - Fractured
1978-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-06-04 Perforation Treatment Performed - Jet Perforation
1978-06-04 Well Abandoned
1978-06-04 Well Fluid changed to Crude Oil
1978-06-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-01 Open Hole/Barefoot Completion 911.00 917.10 0
1977-02-02 Perforation 914.40 916.50 13
1977-05-13 Acid Treatment 911.00 917.10 0
1977-11-12 Fracture 911.00 917.10 0
1978-06-02 Fracture 911.00 917.10 0
1978-06-04 Packing Device Capped w/Cement 896.10 896.10 0
1978-06-04 Perforation 648.90 651.10 0
1978-06-04 Packing Device Capped w/Cement 646.20 646.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 862 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-01-29 Kick 917.10 917.10

For data sources see[6]

References