X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0065031206000

Well Details

Well ID: 0065031206000
Loading map...
Location: 00/06-12-006-03W5/0
Location Alias: 00/06-12-06-03 W5M
Location Alias 2: 00/06-12-006-03 W5/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 03
Section: 12
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL ESSO CARBONDALE 13-6-6-2
Operator Name: Shell Canada Limited
License Number: 0014920
License Date: 1958-03-04
License Status: Suspension
Spud Date: 1958-03-26
Final Drill Date: 1958-12-27
Well Total Depth: 4275.40 m
Surface Hole Latitude: 49.455601
Surface Hole Longitude: -114.285554

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-03-04 Obtained License
1958-03-26 Direction Drilling Operation Performed - 98
1958-05-28 Well Log Performed
1958-10-12 Well Log Performed
1958-12-27 Finished Drilling
1958-12-28 Well Log Performed
1958-12-31 Production Casing Operation Performed
1959-01-04 Perforation Treatment Performed - Open-Hole Completion
1959-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-03 Perforation Treatment Performed - Acid Wash - No Pressure
1959-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-27 Perforation Treatment Performed - Condensate Squeeze
1959-07-27 Perforation Treatment Performed - Bullet Perforation
1959-07-30 Perforation Treatment Performed - Bullet Perforation
1959-08-03 Perforation Treatment Performed - Cement Squeeze
1959-08-07 Perforation Treatment Performed - Cement Squeeze
1959-08-10 Perforation Treatment Performed - Cement Squeeze
1959-08-13 Perforation Treatment Performed - Jet Perforation
1959-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-20 Perforation Treatment Performed - Cement Squeeze
1959-10-26 Well Mode changed to Drilled and Cased
1961-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-16 Well Began Production
1962-03-16 Well Fluid changed to Gas
1962-03-16 Well Mode changed to Flowing
1972-11-15 Well Fluid changed to Gas
1972-11-15 Well Mode changed to Suspended
1987-10-26 Perforation Treatment Performed - Jet Perforation
1987-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-28 Perforation Treatment Performed - Remedial Casing
1987-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-24 Perforation Treatment Performed - Fractured
1995-09-08 Perforation Treatment Performed - Cement Plug
1995-09-08 Plug Back Performed
1995-09-08 Well Fluid changed to Gas
1995-09-08 Well Mode changed to Abandoned and Whipstocked
2017-05-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1958-03-26 1227.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-04 Open Hole/Barefoot Completion 4122.40 4275.40 0
1959-08-10 Cement Squeeze 3773.40 3779.50 0
1959-08-13 Perforation 3643.60 3645.40 13
1959-08-13 Perforation 3627.10 3636.30 13
1959-08-13 Perforation 3612.50 3616.80 13
1959-08-17 Acid Treatment 3612.50 3645.40 0
1959-08-20 Cement Squeeze 3612.50 3645.40 0
1961-05-25 Acid Treatment 4122.40 4275.40 0
1987-10-26 Perforation 4000.00 4004.00 4
1987-10-28 Acid Treatment 4000.00 4004.00 0
1987-10-28 Remedial Casing Cementing 4000.00 4004.00 0
1959-02-02 Acid Treatment 4122.40 4275.40 0
1987-11-13 Acid Treatment 4122.40 4275.40 0
1987-11-24 Fracture 4122.40 4275.40 0
1995-09-08 Cement Plug 3893.00 3986.70 0
1959-02-03 Acid Wash 4122.40 4275.40 0
1959-02-19 Acid Treatment 4122.40 4275.40 0
1959-02-27 Condensate Squeeze 4122.40 4275.40 0
1959-07-27 Bullet Perforation 3773.40 3779.50 13
1959-07-30 Bullet Perforation 3773.40 3779.50 13
1959-08-03 Cement Squeeze 3773.40 3779.50 0
1959-08-07 Cement Squeeze 3773.40 3779.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1395 0.0 0.0 0.0
1969 2245 0.0 0.0 0.0

For data sources see[6]

References