X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0065022005000

Well Details

Well ID: 0065022005000
Loading map...
Location: 00/05-20-006-02W5/0
Location Alias: 00/05-20-06-02 W5M
Location Alias 2: 00/05-20-006-02 W5/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 02
Section: 20
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL - IMPERIAL WATERTON 14-17-6-2
Operator Name: Shell Canada Limited
License Number: 0030614
License Date: 1966-06-27
License Status: Amended
Spud Date: 1966-07-05
Final Drill Date: 1967-02-11
Well Total Depth: 4130.00 m
Surface Hole Latitude: 49.485370
Surface Hole Longitude: -114.243810

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-27 Obtained License
1966-07-05 Direction Drilling Operation Performed - 98
1967-02-11 Finished Drilling
1967-02-11 Well Mode changed to Drilled and Cased
1967-02-27 Production Casing Operation Performed
1967-03-10 Perforation Treatment Performed - Bullet Perforation
1967-03-11 Perforation Treatment Performed - Bullet Perforation
1967-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-23 Well Began Production
1967-08-23 Well Fluid changed to Gas
1967-08-23 Well Mode changed to Flowing
1967-11-07 Perforation Treatment Performed - Condensate Squeeze
1969-11-27 Perforation Treatment Performed - Abrasa-Jet Perforation
1970-05-25 Perforation Treatment Performed - Condensate Squeeze
1970-09-10 Perforation Treatment Performed - Acid Wash - No Pressure
1971-08-19 Well Fluid changed to Gas
1971-08-19 Well Mode changed to Suspended
1986-11-09 Well Log Performed
1986-11-14 Well Log Performed
1986-11-16 Perforation Treatment Performed - Jet Perforation
1986-11-16 Well Log Performed
1986-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-12 Well Log Performed
1987-02-04 Well Fluid changed to Gas
1987-02-04 Well Mode changed to Flowing
1992-03-24 Well Fluid changed to Gas
1992-03-24 Well Mode changed to Suspended
1992-12-07 Well Fluid changed to Gas
1992-12-07 Well Mode changed to Flowing
1996-08-06 Well Fluid changed to Gas
1996-08-06 Well Mode changed to Suspended
1996-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-22 Plug Back Performed
1996-08-22 Well Fluid changed to Gas
1996-08-22 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1966-07-05 2707.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-03-10 Bullet Perforation 3582.90 3583.20 7
1967-03-24 Acid Treatment 3433.30 3583.20 0
1967-11-07 Condensate Squeeze 3435.70 3512.20 0
1967-11-07 Condensate Squeeze 3527.10 3582.60 0
1969-11-27 Hydra Jet Perforation 3286.70 3286.70 0
1970-05-25 Condensate Squeeze 3512.20 3582.60 0
1970-09-10 Acid Wash 3512.20 3582.60 0
1986-11-16 Perforation 3306.80 3506.60 2
1986-11-16 Perforation 3308.90 3309.50 2
1986-11-16 Perforation 3368.90 3375.70 2
1986-11-16 Perforation 3378.40 3379.70 3
1967-03-10 Bullet Perforation 3568.90 3569.80 7
1986-11-16 Perforation 3386.00 3386.60 2
1986-11-16 Perforation 3389.40 3392.40 2
1986-11-16 Perforation 3404.90 3407.90 2
1986-11-16 Perforation 3432.90 3435.70 4
1986-11-16 Perforation 3469.50 3470.40 4
1986-11-16 Perforation 3504.00 3504.90 4
1986-11-16 Perforation 3505.80 3507.00 4
1986-11-16 Perforation 3512.20 3513.70 4
1986-11-16 Perforation 3526.20 3527.10 4
1986-11-16 Perforation 3536.60 3537.20 5
1967-03-10 Bullet Perforation 3554.30 3555.20 7
1986-11-16 Perforation 3544.20 3545.10 4
1986-11-16 Perforation 3548.80 3550.30 7
1986-11-16 Perforation 3553.70 3555.80 6
1986-11-16 Perforation 3568.80 3571.20 7
1986-11-16 Perforation 3582.50 3583.10 2
1986-11-19 Acid Treatment 3305.60 3583.10 0
1996-08-22 Packing Device Capped w/Cement 3255.00 3265.00 0
1967-03-10 Bullet Perforation 3544.20 3544.80 7
1967-03-10 Bullet Perforation 3526.50 3527.10 7
1967-03-11 Bullet Perforation 3512.20 3513.70 10
1967-03-11 Bullet Perforation 3504.30 3507.00 16
1967-03-11 Bullet Perforation 3469.50 3470.50 7
1967-03-11 Bullet Perforation 3433.30 3435.70 16

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 1285 0.0 0.0 0.0
1969 2586 0.0 0.0 0.0
1970 4825 0.0 0.0 0.0
1971 3344 0.0 0.0 0.0
1978 43 0.0 0.0 0.0
1986 197 0.0 0.0 0.0
1987 963 0.0 0.0 0.0
1988 2827 0.0 0.0 0.0
1989 5661 0.0 0.0 0.0
1990 7304 0.0 0.0 0.0
1991 5397 0.0 0.0 0.0
1992 2054 0.0 0.0 0.0
1993 7946 0.0 0.0 0.0
1994 8749 0.0 0.0 0.0
1995 4237 0.0 0.0 0.0
1996 4938 0.0 0.0 0.0

For data sources see[6]

References