X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0065021706002

Well Details

Well ID: 0065021706002
Loading map...
Location: 00/06-17-006-02W5/2
Location Alias: 00/06-17-06-02 W5M
Location Alias 2: 00/06-17-006-02 W5/02
Country: Canada
Province: Alberta
Township: 006
Meridian: 5
Range: 02
Section: 17
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL - IMPERIAL B WATERTON 6-17-6-2
Operator Name: Shell Canada Limited
License Number: 0014011
License Date: 1957-09-20
License Status: Issued
Spud Date: 1957-09-29
Final Drill Date: 1958-04-20
Well Total Depth: 4114.20 m
Surface Hole Latitude: 49.471534
Surface Hole Longitude: -114.238241

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-09-20 Obtained License
1957-09-29 Direction Drilling Operation Performed - 98
1957-11-02 Well Log Performed
1958-02-22 Drill Stem Test Performed
1958-04-20 Finished Drilling
1958-04-22 Well Log Performed
1958-04-23 Perforation Treatment Performed - Slotted Liner or Casing
1958-04-25 Liner Casing Operation Performed
1958-04-28 Perforation Treatment Performed - Open-Hole Completion
1958-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-05 Well Mode changed to Drilled and Cased
1961-02-09 Perforation Treatment Performed - Condensate Squeeze
1961-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-15 Perforation Treatment Performed - Fractured
1961-02-28 Perforation Treatment Performed - Fractured
1961-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-26 Perforation Treatment Performed - Fractured
1963-07-13 Perforation Treatment Performed - Cement Squeeze
1964-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-12-05 Well Mode changed to Drilled and Cased
1964-12-08 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-22 Perforation Treatment Performed - Fractured
1964-12-30 Well Began Production
1964-12-30 Well Fluid changed to Gas
1964-12-30 Well Mode changed to Flowing
1971-08-19 Well Fluid changed to Gas
1971-08-19 Well Mode changed to Suspended
1986-10-20 Well Fluid changed to Gas
1986-10-20 Well Mode changed to Flowing
2004-10-14 Liner Casing Operation Performed
2004-11-29 Liner Casing Operation Performed
2004-12-20 Perforation Treatment Performed - Jet Perforation
2004-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-02 Well Fluid changed to Gas
2008-06-02 Well Mode changed to Suspended
2009-06-04 Well Fluid changed to Gas
2009-06-04 Well Mode changed to Flowing
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1957-09-29 3146.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-04-23 Slotted Liner 3962.40 4111.80 0
1961-05-15 Acid Treatment 3962.40 4111.80 0
1961-05-26 Fracture 3962.40 4111.80 0
1963-07-13 Cement Squeeze 3345.20 3801.50 0
1964-12-05 Packing Device Capped w/Cement 3771.90 3771.90 0
1964-12-08 Hydra Jet Perforation 3338.20 3339.40 0
1964-12-08 Hydra Jet Perforation 3340.60 3344.30 0
1964-12-08 Hydra Jet Perforation 3347.60 3358.60 0
1964-12-08 Hydra Jet Perforation 3360.40 3361.60 0
1964-12-08 Hydra Jet Perforation 3486.60 3487.80 0
1964-12-08 Hydra Jet Perforation 3489.00 3490.30 0
1958-04-28 Open Hole/Barefoot Completion 3345.20 3801.50 0
1964-12-08 Hydra Jet Perforation 3501.80 3501.80 0
1964-12-09 Acid Treatment 3338.20 3501.80 0
1964-12-22 Fracture 3338.20 3501.80 0
2004-12-20 Perforation 3338.00 3350.00 3
2004-12-20 Perforation 3358.00 3362.00 3
2004-12-20 Perforation 3422.00 3432.00 13
2004-12-20 Perforation 3457.00 3465.00 13
2004-12-20 Perforation 3470.00 3474.00 13
2004-12-20 Perforation 3484.00 3502.00 20
2004-12-28 Acid Treatment 3338.00 3502.00 0
1958-04-30 Acid Treatment 3962.40 4111.80 0
2004-12-29 Acid Treatment 3338.00 3502.00 0
1958-05-18 Acid Treatment 3962.40 4111.80 0
1961-02-09 Condensate Squeeze 3962.40 4111.80 0
1961-02-11 Acid Treatment 3962.40 4111.80 0
1961-02-15 Fracture 3962.40 4111.80 0
1961-02-28 Fracture 3962.40 4111.80 0
1961-05-10 Acid Treatment 3962.40 4111.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1446 0.0 0.0 0.0
1969 3743 0.0 0.0 0.0
1970 6343 0.0 0.0 0.0
1971 4472 0.0 0.0 0.0
1978 140 0.0 0.0 0.0
1986 1536 0.0 0.0 0.0
1987 5867 0.0 0.0 0.0
1988 8428 0.0 0.0 0.0
1989 8313 0.0 0.0 0.0
1990 8190 0.0 0.0 0.0
1991 7584 0.0 0.0 0.0
1992 7868 0.0 0.0 0.0
1993 8084 0.0 0.0 0.0
1994 8746 0.0 0.0 0.0
1995 4243 0.0 0.0 0.0
1996 6515 0.0 0.0 0.0
1997 8292 0.0 0.0 0.0
1998 7389 0.0 0.0 0.0
1999 7335 0.0 0.0 0.0
2000 7436 0.0 0.0 0.0
2001 8335 0.0 0.0 0.0
2002 7839 0.0 0.0 0.0
2003 8195 0.0 0.0 0.0
2004 5890 0.0 0.0 0.0
2005 8030 0.0 0.0 0.0
2006 8411 0.0 0.0 0.0
2007 7752 0.0 0.0 0.0
2009 2940 0.0 0.0 0.0
2010 5588 0.0 0.0 0.0
2011 8040 0.0 0.0 0.0
2012 5324 0.0 0.0 0.0
2013 8308 0.0 0.0 0.0
2014 8213 0.0 0.0 0.0
2015 8708 0.0 0.0 0.0
2016 7340 0.0 0.0 0.0
2017 7519 0.0 0.0 0.0
2018 8105 0.0 0.0 0.0
2019 8046 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

References