Well Details

Well ID: 0055021506000
Loading map...
Location: 00/06-15-005-02W5/0
Location Alias: 00/06-15-05-02 W5M
Location Alias 2: 00/06-15-005-02 W5/00
Country: Canada
Province: Alberta
Township: 005
Meridian: 5
Range: 02
Section: 15
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: TEXACO GLADSTONE CREEK A-6-15
Operator Name: Shell Canada Limited
License Number: 0013351
License Date: 1957-05-10
License Status: Abandoned
Spud Date: 1957-05-22
Final Drill Date: 1958-01-11
Well Total Depth: 4236.70 m
Surface Hole Latitude: 49.384171
Surface Hole Longitude: -114.193954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-05-10 Obtained License
1957-10-31 Drill Stem Test Performed
1957-11-18 Drill Stem Test Performed
1957-11-30 Drill Stem Test Performed
1957-12-16 Drill Stem Test Performed
1958-01-01 Drill Stem Test Performed
1958-01-11 Finished Drilling
1958-01-11 Lost Circulation Occurred
1958-01-16 Production Casing Operation Performed
1958-01-23 Perforation Treatment Performed - Bullet Perforation
1958-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-02-22 Perforation Treatment Performed - Cement Squeeze
1958-02-24 Perforation Treatment Performed - Bullet Perforation
1958-02-26 Perforation Treatment Performed - Bullet Perforation
1958-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-04-25 Well Mode changed to Drilled and Cased
1962-10-10 Well Began Production
1962-10-10 Well Fluid changed to Gas
1962-10-10 Well Mode changed to Flowing
1971-08-19 Well Fluid changed to Gas
1971-08-19 Well Mode changed to Suspended
1985-01-13 Well Log Performed
1985-06-14 Well Log Performed
1985-06-16 Perforation Treatment Performed - Cement Plug
1985-06-16 Plug Back Performed
1985-06-17 Perforation Treatment Performed - Cement Plug
1985-06-17 Plug Back Performed
1985-06-18 Well Log Performed
1985-06-19 Well Log Performed
1985-07-04 Well Log Performed
1985-07-05 Well Log Performed
1985-07-06 Well Log Performed
1985-07-08 Well Log Performed
1985-07-10 Perforation Treatment Performed - Jet Perforation
1985-07-11 Perforation Treatment Performed - Jet Perforation
1985-07-11 Well Log Performed
1985-07-12 Perforation Treatment Performed - Acid Wash - No Pressure
1985-07-15 Well Log Performed
1985-09-16 Perforation Treatment Performed - Jet Perforation
1985-09-16 Well Log Performed
1985-09-18 Perforation Treatment Performed - Jet Perforation
1985-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-21 Perforation Treatment Performed - Cement Plug
2011-02-21 Plug Back Performed
2011-02-21 Well Fluid changed to Gas
2011-02-21 Well Mode changed to Abandoned Zone
2011-02-22 Perforation Treatment Performed - Cement Plug
2011-02-22 Plug Back Performed
2011-02-23 Perforation Treatment Performed - Jet Perforation
2011-02-24 Perforation Treatment Performed - Cement Squeeze
2011-02-24 Plug Back Performed
2011-08-09 Well Abandoned
2011-08-09 Well Fluid changed to Gas
2011-08-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-01-23 Bullet Perforation 4089.20 4090.40 13
1958-01-23 Bullet Perforation 4192.80 4201.40 13
1958-01-23 Bullet Perforation 4203.20 4205.60 13
1958-01-23 Bullet Perforation 4207.50 4208.10 13
1958-01-23 Bullet Perforation 4211.70 4212.90 13
1958-01-23 Bullet Perforation 4214.50 4215.10 13
1958-01-23 Bullet Perforation 4219.00 4224.20 13
1958-02-03 Acid Treatment 4089.20 4224.20 0
1958-02-06 Acid Treatment 4089.20 4224.20 0
1958-02-10 Acid Treatment 4089.20 4224.20 0
1958-02-17 Acid Treatment 4089.20 4224.20 0
1958-01-23 Bullet Perforation 4095.30 4095.90 13
1958-02-22 Cement Squeeze 4089.20 4224.20 0
1958-02-24 Bullet Perforation 3927.70 3928.60 13
1958-02-24 Bullet Perforation 3929.50 3931.30 13
1958-02-24 Bullet Perforation 3936.20 3936.80 13
1958-02-24 Bullet Perforation 3980.10 3981.90 13
1958-02-24 Bullet Perforation 3984.70 3986.20 13
1958-02-24 Bullet Perforation 3993.80 3995.00 13
1958-02-26 Bullet Perforation 3494.20 3500.30 13
1958-02-26 Bullet Perforation 3500.90 3503.40 13
1958-02-26 Bullet Perforation 3504.00 3505.20 13
1958-01-23 Bullet Perforation 4099.00 4111.10 13
1958-02-26 Bullet Perforation 3511.00 3513.10 13
1958-02-26 Bullet Perforation 3521.70 3522.90 13
1958-02-26 Bullet Perforation 3549.10 3549.70 13
1958-02-26 Bullet Perforation 3552.70 3554.00 13
1958-02-26 Bullet Perforation 3566.80 3569.20 13
1958-02-26 Bullet Perforation 3588.40 3592.40 13
1958-02-26 Bullet Perforation 3611.30 3612.50 13
1958-02-26 Bullet Perforation 3613.70 3617.40 13
1958-02-26 Bullet Perforation 3636.60 3637.80 13
1958-02-26 Bullet Perforation 3654.60 3655.20 13
1958-01-23 Bullet Perforation 4114.20 4114.80 13
1958-02-26 Bullet Perforation 3666.40 3667.00 13
1958-02-26 Bullet Perforation 3680.20 3680.80 13
1958-02-26 Bullet Perforation 3681.40 3683.20 13
1958-02-26 Bullet Perforation 3700.90 3701.50 13
1958-02-26 Bullet Perforation 3708.80 3710.90 13
1958-02-26 Bullet Perforation 3712.80 3714.90 13
1958-02-26 Bullet Perforation 3715.80 3717.30 13
1958-02-26 Bullet Perforation 3748.40 3751.50 13
1958-02-26 Bullet Perforation 3752.40 3753.30 13
1958-02-26 Bullet Perforation 3764.00 3765.20 13
1958-01-23 Bullet Perforation 4117.80 4119.10 13
1958-02-26 Bullet Perforation 3767.60 3769.50 13
1958-02-26 Bullet Perforation 3771.60 3772.50 13
1958-02-26 Bullet Perforation 3773.40 3783.80 13
1958-02-26 Bullet Perforation 3792.00 3794.80 13
1958-02-26 Bullet Perforation 3832.60 3834.70 13
1958-02-26 Bullet Perforation 3846.60 3847.50 13
1958-02-26 Bullet Perforation 3853.60 3854.50 13
1958-02-26 Bullet Perforation 3857.90 3859.40 13
1958-02-26 Bullet Perforation 3901.40 3902.40 13
1958-02-26 Bullet Perforation 3912.40 3913.00 13
1958-01-23 Bullet Perforation 4133.10 4138.00 13
1958-02-26 Bullet Perforation 4050.20 4051.40 13
1958-03-03 Acid Treatment 3494.20 4051.40 0
1958-03-04 Acid Treatment 3494.20 4051.40 0
1985-06-16 Cement Plug 3788.80 3873.00 0
1985-06-17 Cement Plug 3753.80 3788.80 0
1985-07-10 Perforation 3514.00 3523.00 6
1985-07-10 Perforation 3525.00 3527.80 6
1985-07-11 Perforation 3541.00 3547.00 6
1985-07-11 Perforation 3560.40 3562.00 6
1985-07-11 Perforation 3565.00 3570.00 6
1958-01-23 Bullet Perforation 4139.20 4141.90 13
1985-07-11 Perforation 3581.00 3590.00 6
1985-07-11 Perforation 3636.00 3639.00 6
1985-07-11 Perforation 3641.00 3643.00 6
1985-07-12 Acid Wash 3494.20 3753.30 0
1985-09-16 Perforation 3746.60 3749.60 6
1985-09-18 Perforation 3679.00 3682.00 6
1985-09-18 Perforation 3708.00 3710.00 6
1985-09-18 Perforation 3712.00 3714.00 6
1985-09-19 Acid Treatment 3494.20 3753.30 0
2011-02-21 Cement Plug 3326.00 3470.80 0
1958-01-23 Bullet Perforation 4144.70 4146.20 13
2011-02-22 Cement Plug 3120.00 3172.00 0
2011-02-23 Perforation 625.00 626.00 17
2011-02-24 Cement Squeeze 625.00 626.00 0
1958-01-23 Bullet Perforation 4146.20 4191.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1135 0.0 0.0 0.0
1969 3674 0.0 0.0 0.0
1970 6888 0.0 0.0 0.0
1971 4028 0.0 0.0 0.0
1978 120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-01-11 Lost Circulation 1817.20 1817.20
1958-01-11 Lost Circulation 3276.30 3276.30

For data sources see[6]