X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0045023604000

Well Details

Well ID: 0045023604000
Loading map...
Location: 00/04-36-004-02W5/0
Location Alias: 00/04-36-04-02 W5M
Location Alias 2: 00/04-36-004-02 W5/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 5
Range: 02
Section: 36
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL 13 WATERTON 14-26-4-2
Operator Name: Shell Canada Limited
License Number: 0019504
License Date: 1960-08-08
License Status: Amended
Spud Date: 1960-09-01
Final Drill Date: 1960-12-15
Well Total Depth: 4255.00 m
Surface Hole Latitude: 49.328480
Surface Hole Longitude: -114.164535

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-08 Obtained License
1960-12-15 Finished Drilling
1960-12-18 Drill Stem Test Performed
1960-12-22 Drill Stem Test Performed
1960-12-23 Liner Casing Operation Performed
1960-12-26 Perforation Treatment Performed - Open-Hole Completion
1960-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-03 Perforation Treatment Performed - Fractured
1961-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-01-21 Perforation Treatment Performed - Bullet Perforation
1961-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-14 Well Mode changed to Drilled and Cased
1962-09-22 Well Began Production
1962-09-22 Well Fluid changed to Gas
1962-09-22 Well Mode changed to Flowing
1968-05-21 Drill Stem Test Performed
1968-06-05 Drill Stem Test Performed
1968-06-18 Drill Stem Test Performed
1968-07-09 Drill Stem Test Performed
1968-07-10 Drill Stem Test Performed
1968-07-22 Drill Stem Test Performed
1968-07-23 Drill Stem Test Performed
1968-08-03 Drill Stem Test Performed
1968-08-13 Perforation Treatment Performed - Open-Hole Completion
1968-08-19 Well Fluid changed to Gas
1968-08-19 Well Mode changed to Flowing
1968-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-27 Perforation Treatment Performed - Jet Perforation
1969-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-15 Well Fluid changed to Gas
1972-11-15 Well Mode changed to Suspended
1986-07-28 Perforation Treatment Performed - Fractured
1986-10-07 Well Fluid changed to Gas
1986-10-07 Well Mode changed to Flowing
1995-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-31 Plug Back Performed
1995-09-01 Perforation Treatment Performed - Bridge Plug No Cement Required
1995-09-01 Well Fluid changed to Gas
1995-09-01 Well Mode changed to Abandoned and Whipstocked
1995-11-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-12-26 Open Hole/Barefoot Completion 2956.60 3139.40 0
1961-01-22 Acid Treatment 2835.60 2898.60 0
1961-02-14 Acid Treatment 2835.60 2898.60 0
1968-08-13 Open Hole/Barefoot Completion 3312.00 3652.70 0
1968-08-29 Acid Treatment 3312.00 3652.70 0
1968-09-05 Acid Treatment 3312.00 3652.70 0
1968-09-09 Acid Treatment 3312.00 3652.70 10
1969-06-27 Perforation 2894.70 2896.20 10
1969-06-28 Acid Treatment 2894.70 2896.20 0
1986-07-28 Fracture 2835.60 3652.70 0
1995-08-31 Packing Device Capped w/Cement 2900.10 2908.10 0
1960-12-27 Acid Treatment 2956.60 3139.40 0
1995-09-01 Bridge Plug, No Cement 2829.00 2829.00 0
1961-01-03 Fracture 2956.60 3139.40 0
1961-01-20 Packing Device Capped w/Cement 2934.30 2934.30 0
1961-01-21 Bullet Perforation 2893.80 2898.60 7
1961-01-21 Bullet Perforation 2878.20 2884.00 7
1961-01-21 Bullet Perforation 2874.30 2876.10 10
1961-01-21 Bullet Perforation 2846.20 2848.70 7
1961-01-21 Bullet Perforation 2835.60 2843.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 319 0.0 0.0 0.0
1969 141 0.0 0.0 0.0
1986 2051 0.0 0.0 0.0
1987 8403 0.0 0.0 0.0
1988 8762 0.0 0.0 0.0
1989 8169 0.0 0.0 0.0
1990 8517 0.0 0.0 0.0
1991 7356 0.0 0.0 0.0
1992 7871 0.0 0.0 0.0
1993 8307 0.0 0.0 0.0
1994 8373 0.0 0.0 0.0
1995 5126 0.0 0.0 0.0

For data sources see[5]

References