X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0045010509000

Well Details

Well ID: 0045010509000
Loading map...
Location: 00/09-05-004-01W5/0
Location Alias: 00/09-05-04-01 W5M
Location Alias 2: 00/09-05-004-01 W5/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 5
Range: 01
Section: 05
County/Municipality: Municipal District of Pincher Creek No. 9
Well Name: SHELL 12 WATERTON IN 7-5-4-1
Operator Name: Shell Canada Limited
License Number: 0019264
License Date: 1960-06-28
License Status: Abandoned
Spud Date: 1960-06-30
Final Drill Date: 1960-11-07
Well Total Depth: 3962.70 m
Surface Hole Latitude: 49.265929
Surface Hole Longitude: -114.101435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-28 Obtained License
1960-11-01 Drill Stem Test Performed
1960-11-07 Finished Drilling
1960-11-12 Drill Stem Test Performed
1960-11-15 Production Casing Operation Performed
1960-11-21 Perforation Treatment Performed - Open-Hole Completion
1960-11-22 Perforation Treatment Performed - Acid Wash - No Pressure
1960-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-12 Well Mode changed to Drilled and Cased
1965-03-07 Perforation Treatment Performed - Selective Bullet Perforations
1965-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-08 Well Began Production
1965-04-08 Well Fluid changed to Gas
1965-04-08 Well Mode changed to Flowing
1967-08-10 Well Began Injection
1967-08-10 Well Fluid changed to Gas
1967-08-10 Well Type changed to Injection
1972-01-25 Well Fluid changed to Gas
1972-01-25 Well Mode changed to Suspended
1972-01-25 Well Type changed to Injection
1972-11-08 Well Fluid changed to Gas
1972-11-08 Well Type changed to Injection
1987-02-04 Well Fluid changed to Gas
1987-02-04 Well Mode changed to Suspended
1987-02-04 Well Type changed to Injection
1993-07-07 Well Log Performed
1993-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-23 Perforation Treatment Performed - Jet Perforation
1993-11-13 Well Log Performed
1993-11-18 Well Log Performed
1995-11-25 Well Log Performed
1995-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-27 Well Log Performed
2003-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-18 Perforation Treatment Performed - Cement Squeeze
2003-07-18 Perforation Treatment Performed - Jet Perforation
2003-07-18 Plug Back Performed
2003-07-18 Well Fluid changed to Gas
2003-07-18 Well Mode changed to Abandoned Zone
2003-07-18 Well Type changed to Injection
2003-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-20 Perforation Treatment Performed - Cement Squeeze
2003-07-20 Perforation Treatment Performed - Jet Perforation
2003-07-20 Plug Back Performed
2003-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-22 Perforation Treatment Performed - Jet Perforation
2003-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-23 Perforation Treatment Performed - Cement Squeeze
2003-07-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-21 Open Hole/Barefoot Completion 3785.60 3962.70 0
1965-03-12 Acid Treatment 3703.30 3736.80 0
1965-03-19 Acid Treatment 3703.30 3736.80 0
1993-07-09 Packing Device Capped w/Cement 3748.00 3751.70 0
1993-07-23 Acid Treatment 3703.30 3736.80 0
1993-07-23 Perforation 3637.00 3645.00 13
1993-07-23 Perforation 3675.00 3677.50 13
1993-07-23 Perforation 3680.00 3682.00 13
1995-11-27 Packing Device Capped w/Cement 3614.00 3622.00 0
2003-07-18 Perforation 2350.00 2351.00 13
2003-07-18 Cement Squeeze 2350.00 2351.00 0
1960-11-22 Acid Wash 3785.60 3947.20 0
2003-07-18 Packing Device Capped w/Cement 2345.00 2355.00 0
2003-07-19 Packing Device Capped w/Cement 2321.00 2345.00 0
2003-07-20 Perforation 2220.00 2221.00 13
2003-07-20 Cement Squeeze 2220.00 2221.00 0
2003-07-20 Packing Device Capped w/Cement 2216.00 2225.00 0
2003-07-21 Packing Device Capped w/Cement 2201.00 2216.00 0
2003-07-22 Perforation 610.00 611.00 13
2003-07-23 Cement Squeeze 610.00 611.00 0
2003-07-23 Packing Device Capped w/Cement 309.00 617.00 0
1960-11-27 Acid Treatment 3785.60 3947.20 0
1965-03-07 Selective Bullet Perforations 3703.30 3703.90 0
1965-03-07 Selective Bullet Perforations 3704.20 3705.50 0
1965-03-07 Selective Bullet Perforations 3706.10 3711.50 0
1965-03-07 Selective Bullet Perforations 3711.90 3712.20 0
1965-03-07 Selective Bullet Perforations 3721.90 3722.20 0
1965-03-07 Selective Bullet Perforations 3735.60 3736.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0

For data sources see[5]

References