37-007-20435

Well Details

Well ID: 37-007-20435
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 151385
Farm/Lease Name: BEAVER PAD 12 1H
License Status: Active
Spud Date: 05/09/2016
Permit Date: 6/11/2014
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.778822
Longitude: -80.170516

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-12 Produced Fluid (in Barrels) RWC 802 28.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2018-12 Produced Fluid (in Barrels) RWC 802 107.20 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018-12 Produced Fluid (in Barrels) RWC 802 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2483913 Primary Facility 2016-05-09 Drilling/Alteration No Violations Noted AN AUGER RIG IS INSTALLING THE CELLAR AND 40' OF 16" CONDUUCTOR.
2496679 Primary Facility 2016-06-01 Drilling/Alteration No Violations Noted THE CELLAR AND CONDUCTOR ARE IN. THE WELL IS COVERED WITH A STEEL PLATE.

THE SITE IS IN GOOD CONDITION.

2518496 Primary Facility 2016-09-07 Routine/Complete Inspection No Violations Noted
2570673 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted On 3/13/2017, WQS Brian MacQuarrie onsite at unconventional well site. Three wells in production (2H, 3H and 4H). Conductor casing installed at the 1H. Two 400 bbl tanks in production installed within stainless steel containment structure. Temporary above ground storage tank installed onsite containing impaired water. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Snow on ground during inspection.
2573748 Primary Facility 2017-03-22 Routine/Complete Inspection No Violations Noted On 3/22/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells drilled. Three wells in production. Two 400 bbl tanks installed within stainless steel containment structure. Temporary above ground storage tank installed onsite containing impaired water. Well secondary containment and drill equipment removed from site. One frac tank onsite within secondary containment. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. No apparent Erosion and Sedimentation issues.
2584295 Primary Facility 2017-04-19 Routine/Complete Inspection No Violations Noted On 04/19/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells drilled. Three wells in production. Two 400 bbl tanks installed within stainless steel containment structure. Temporary above ground storage tank installed onsite containing impaired water. Well secondary containment and drill equipment removed from site. One frac tank onsite within secondary containment. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. No apparent Erosion and Sedimentation issues.
2604224 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted On 06/15/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells drilled. Three wells in production. Two 400 bbl tanks installed within stainless steel containment structure. Temporary above ground storage tank installed onsite containing impaired water. Well secondary containment and drill equipment removed from site. One frac tank onsite within secondary containment. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. No apparent Erosion and Sedimentation issues.