If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 2: | Line 2: | ||
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
− | | Well ID: 37- | + | | Well ID: 37-083-11138 |
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.953944, -78.642360 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 9: | Line 9: | ||
| State: Pennsylvania | | State: Pennsylvania | ||
|- | |- | ||
− | | County: [[ | + | | County: [[McKean_County,_Pennsylvania|McKean]] |
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Bradford City,_McKean_County,_Pennsylvania|Bradford City]] |
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[WILLARD M CLINE]] |
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: FIFTH WARD HS 1 |
|- | |- | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 01 | + | | Spud Date: 1800-01-01 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: |
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
Line 29: | Line 29: | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: 41.953944 |
|- | |- | ||
− | | Longitude: - | + | | Longitude: -78.642360 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 60: | Line 85: | ||
!scope="col" | Water Production Days | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | | + | | 1997 |
− | | style="text-align: right;" | | + | | [[WILLARD M CLINE]] |
+ | | style="text-align: right;" | 535.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1998 | ||
+ | | [[WILLARD M CLINE]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 471.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | |- | ||
+ | | 1999 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 257.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
− | | | + | | 2001 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2002 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 437.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
− | | | + | | 2003 |
− | | style="text-align: right;" | | + | | [[WILLARD M CLINE]] |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 301.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | |- | ||
+ | | 2004 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 253.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
− | | | + | | 2005 |
− | | style="text-align: right;" | | + | | [[WILLARD M CLINE]] |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 207.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | |- | ||
+ | | 2006 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 236.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
− | | | + | | 2007 |
− | | style="text-align: right;" | | + | | [[WILLARD M CLINE]] |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 246.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | |- | ||
+ | | 2008 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 96.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
− | | | + | | 2009 |
− | | style="text-align: right;" | | + | | [[WILLARD M CLINE]] |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 200.00 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | |- | ||
+ | | 2010 | ||
+ | | [[WILLARD M CLINE]] | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 107.86 | ||
+ | | style="text-align: right;" | 102 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
− | | | + | | [[WILLARD M CLINE]] |
− | |||
− | |||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 6.25 | ||
+ | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
− | | | + | | [[WILLARD M CLINE]] |
− | |||
− | |||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 21.92 | ||
+ | | style="text-align: right;" | 40 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
− | | | + | | [[WILLARD M CLINE]] |
− | |||
− | |||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 36.23 | ||
+ | | style="text-align: right;" | 50 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
− | | | + | | [[WILLARD M CLINE]] |
− | |||
− | |||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 35.00 | ||
+ | | style="text-align: right;" | 48 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
− | | | + | | [[WILLARD M CLINE]] |
− | |||
− | |||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
+ | | style="text-align: right;" | 60.25 | ||
+ | | style="text-align: right;" | 50 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 176: | Line 264: | ||
|}--> | |}--> | ||
− | + | == Inspection Data == | |
==== Inspections Performed ==== | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 186: | Line 274: | ||
!scope="col" | Inspection Comments | !scope="col" | Inspection Comments | ||
|- | |- | ||
− | | | + | | 2622021 |
+ | | Primary Facility | ||
+ | | 2017-07-27 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | At the end of this inspection, I met with Mark Cline and we discussed the need for proper collection and disposal of production water before continuing the production of the two wells that are plumbed into the referenced tank/separator system. Mark agreed to cease production of the wells until a brine tank was installed or another acceptable solution was implemented. The remediation of the impacted soil will be addressed when equipment is brought on site to upgrade the infrastructure at the tank battery. | ||
+ | |- | ||
+ | |} | ||
<!--==== Violations Commited ==== | <!--==== Violations Commited ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 210: | Line 305: | ||
|- | |- | ||
|}--> | |}--> | ||
− | + | For data sources see<ref>{{cite web | |
− | < | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | { | + | | date = 2019-05-20 |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-083-11138 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.953944,"lon":-78.64236,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Bradford City | |
Operator Name: WILLARD M CLINE | |
Well Pad ID: | |
Farm/Lease Name: FIFTH WARD HS 1 | |
License Status: Active | |
Spud Date: 1800-01-01 | |
Permit Date: | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.953944 | |
Longitude: -78.642360 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1997 | WILLARD M CLINE | 535.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | WILLARD M CLINE | 0.00 | 0 | 471.00 | 365 | 0.00 | 0 |
1999 | WILLARD M CLINE | 0.00 | 0 | 257.00 | 365 | 0.00 | 0 |
2001 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2002 | WILLARD M CLINE | 0.00 | 0 | 437.00 | 365 | 0.00 | 0 |
2003 | WILLARD M CLINE | 0.00 | 0 | 301.00 | 365 | 0.00 | 0 |
2004 | WILLARD M CLINE | 0.00 | 0 | 253.00 | 365 | 0.00 | 0 |
2005 | WILLARD M CLINE | 0.00 | 0 | 207.00 | 365 | 0.00 | 0 |
2006 | WILLARD M CLINE | 0.00 | 0 | 236.00 | 365 | 0.00 | 0 |
2007 | WILLARD M CLINE | 0.00 | 0 | 246.00 | 365 | 0.00 | 0 |
2008 | WILLARD M CLINE | 0.00 | 0 | 96.00 | 365 | 0.00 | 0 |
2009 | WILLARD M CLINE | 0.00 | 0 | 200.00 | 365 | 0.00 | 0 |
2010 | WILLARD M CLINE | 0.00 | 0 | 107.86 | 102 | 0.00 | 0 |
2014 | WILLARD M CLINE | 0.00 | 0 | 6.25 | 365 | 0.00 | 0 |
2015 | WILLARD M CLINE | 0.00 | 0 | 21.92 | 40 | 0.00 | 0 |
2016 | WILLARD M CLINE | 0.00 | 0 | 36.23 | 50 | 0.00 | 0 |
2017 | WILLARD M CLINE | 0.00 | 0 | 35.00 | 48 | 0.00 | 0 |
2018 | WILLARD M CLINE | 0.00 | 0 | 60.25 | 50 | 0.00 | 0 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2622021 | Primary Facility | 2017-07-27 | Complaint Inspection | No Violations Noted | At the end of this inspection, I met with Mark Cline and we discussed the need for proper collection and disposal of production water before continuing the production of the two wells that are plumbed into the referenced tank/separator system. Mark agreed to cease production of the wells until a brine tank was installed or another acceptable solution was implemented. The remediation of the impacted soil will be addressed when equipment is brought on site to upgrade the infrastructure at the tank battery. |
For data sources see[5]