X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0044080307000

Well Details

Well ID: 0044080307000
Loading map...
Location: 00/07-03-004-08W4/0
Location Alias: 00/07-03-04-08 W4M
Location Alias 2: 00/07-03-004-08 W4/00
Country: Canada
Province: Alberta
Township: 004
Meridian: 4
Range: 08
Section: 03
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 7-3-4-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0060173
License Date: 1976-09-14
License Status: Issued
Spud Date: 1976-11-15
Final Drill Date: 1976-11-19
Well Total Depth: 951.00 m
Surface Hole Latitude: 49.265062
Surface Hole Longitude: -110.998406

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-14 Obtained License
1976-11-19 Finished Drilling
1976-11-20 Drill Stem Test Performed
1976-11-21 Drill Stem Test Performed
1976-11-22 Production Casing Operation Performed
1977-06-17 Well Mode changed to Drilled and Cased
1978-08-02 Perforation Treatment Performed - Cement Squeeze
1978-08-02 Perforation Treatment Performed - Selective Jet Perforations
1978-08-04 Perforation Treatment Performed - Jet Perforation
1979-03-02 Well Began Production
1979-03-02 Well Fluid changed to Gas
1979-03-02 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-08-01 Well Fluid changed to Gas
1983-08-01 Well Mode changed to Flowing
2006-07-07 Perforation Treatment Performed - Jet Perforation
2006-07-07 Well Log Performed
2006-08-15 Well Log Performed
2007-08-01 Well Fluid changed to Gas
2007-08-01 Well Mode changed to Suspended
2017-01-25 Well Fluid changed to Gas
2017-01-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-02 Selective Jet Perforations 660.80 673.60 4
1978-08-02 Cement Squeeze 660.80 673.60 0
1978-08-04 Perforation 663.90 664.50 13
2006-07-07 Perforation 638.50 642.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 4870 0.0 0.0 0.0
1980 5658 0.0 0.0 0.0
1981 5036 0.0 0.0 0.0
1983 3006 0.0 0.0 0.0
1984 8492 0.0 0.0 0.0
1985 7541 0.0 0.0 0.0
1986 7416 0.0 0.0 0.0
1987 5409 0.0 0.0 0.0
1988 4011 0.0 0.0 0.0
1989 8114 0.0 0.0 0.0
1990 5404 0.0 0.0 0.0
1991 7468 0.0 0.0 0.0
1992 4992 0.0 0.0 0.0
1993 8586 0.0 0.0 0.0
1994 6641 0.0 0.0 0.0
1995 8516 0.0 0.0 0.0
1996 8027 0.0 0.0 0.0
1997 8495 0.0 0.0 0.0
1998 8597 0.0 0.0 0.0
1999 8559 0.0 0.0 0.0
2000 8209 0.0 0.0 0.0
2001 6551 0.0 0.0 0.0
2002 7058 0.0 0.0 0.0
2003 7737 0.0 0.0 0.0
2004 8303 0.0 0.0 0.0
2005 8387 0.0 0.0 0.0
2006 2951 0.0 0.0 0.0
2017 7895 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References