X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0034241414002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0034241414002
 
| Well ID: 0034241414002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.214414, -113.134451 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.214414, -113.134451 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-14-003-24W4/2
 
| Location: 00/14-14-003-24W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/14-14-003-24 W4/02
 
| Location Alias 2: 00/14-14-003-24 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 003
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 14
 
|-
 
|-
 
| County/Municipality: [[Cardston County,_Alberta|Cardston County]]
 
| County/Municipality: [[Cardston County,_Alberta|Cardston County]]
Line 17: Line 27:
 
| Well Name: RAIMOUNT ET AL WOOLFD 14-14-3-24
 
| Well Name: RAIMOUNT ET AL WOOLFD 14-14-3-24
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Raimount Energy Corp.]]
 
|-
 
|-
 
| License Number: 0082141
 
| License Number: 0082141
Line 29: Line 39:
 
| Final Drill Date: 1980-06-05
 
| Final Drill Date: 1980-06-05
 
|-
 
|-
| Well Total Depth: 2610 m
+
| Well Total Depth: 2610.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 49.214414
 
| Surface Hole Latitude: 49.214414
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1980-04-15
 +
| Obtained License
 +
|-
 +
| 1980-05-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1980-06-03
 +
| Kick Occurred
 +
|-
 +
| 1980-06-05
 +
| Finished Drilling
 +
|-
 +
| 1980-06-08
 +
| Production Casing Operation Performed
 +
|-
 +
| 1980-06-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-07-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-07-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-07-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-07-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1980-07-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-07-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-07-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-07-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-08-13
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1981-08-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-08-27
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1982-02-09
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-02-02
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2001-02-02
 +
| Plug Back Performed
 +
|-
 +
| 2001-02-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-02-03
 +
| Well Log Performed
 +
|-
 +
| 2001-02-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-04
 +
| Well Log Performed
 +
|-
 +
| 2001-02-05
 +
| Well Log Performed
 +
|-
 +
| 2001-02-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-02-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-06
 +
| Plug Back Performed
 +
|-
 +
| 2001-02-06
 +
| Well Log Performed
 +
|-
 +
| 2001-02-06
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-02-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-02-07
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2002-09-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-10-07
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-10-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-10-09
 +
| Plug Back Performed
 +
|-
 +
| 2002-10-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-10-21
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 213:
 
| 1980-06-30
 
| 1980-06-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2346
+
| style="text-align: right;" | 2346.00
| style="text-align: right;" | 2352
+
| style="text-align: right;" | 2352.00
| style="text-align: right;" | 7
 
|-
 
| 1980-06-30
 
| Perforation
 
| style="text-align: right;" | 2352.5
 
| style="text-align: right;" | 2359
 
| style="text-align: right;" | 7
 
|-
 
| 1980-07-03
 
| Acid Treatment
 
| style="text-align: right;" | 2346
 
| style="text-align: right;" | 2359
 
| style="text-align: right;" | 0
 
|-
 
| 1980-07-09
 
| Perforation
 
| style="text-align: right;" | 2084
 
| style="text-align: right;" | 2087
 
| style="text-align: right;" | 13
 
|-
 
| 1980-07-10
 
| Acid Treatment
 
| style="text-align: right;" | 2084
 
| style="text-align: right;" | 2087
 
| style="text-align: right;" | 0
 
|-
 
| 1980-07-12
 
| Cement Squeeze
 
| style="text-align: right;" | 2084
 
| style="text-align: right;" | 2087
 
| style="text-align: right;" | 0
 
|-
 
| 1980-07-16
 
| Perforation
 
| style="text-align: right;" | 2042
 
| style="text-align: right;" | 2052
 
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1980-07-17
 
| Acid Treatment
 
| style="text-align: right;" | 2042
 
| style="text-align: right;" | 2052
 
| style="text-align: right;" | 0
 
|-
 
| 1980-07-17
 
| Perforation
 
| style="text-align: right;" | 2027
 
| style="text-align: right;" | 2031
 
| style="text-align: right;" | 13
 
 
|-
 
|-
 
| 1980-07-19
 
| 1980-07-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2027
+
| style="text-align: right;" | 2027.00
| style="text-align: right;" | 2052
+
| style="text-align: right;" | 2052.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-08-13
 
| 1980-08-13
| Fracture  
+
| Fracture
| style="text-align: right;" | 2346
+
| style="text-align: right;" | 2346.00
| style="text-align: right;" | 2359
+
| style="text-align: right;" | 2359.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-08-26
 
| 1981-08-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2036
+
| style="text-align: right;" | 2036.00
| style="text-align: right;" | 2040
+
| style="text-align: right;" | 2040.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-08-27
 
| 1981-08-27
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2036
+
| style="text-align: right;" | 2036.00
| style="text-align: right;" | 2040
+
| style="text-align: right;" | 2040.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-02
 
| 2001-02-02
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1940
+
| style="text-align: right;" | 1940.00
| style="text-align: right;" | 2198.4
+
| style="text-align: right;" | 2198.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-03
 
| 2001-02-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1904
+
| style="text-align: right;" | 1904.00
| style="text-align: right;" | 1912
+
| style="text-align: right;" | 1912.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-04
 
| 2001-02-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1741
+
| style="text-align: right;" | 1741.00
| style="text-align: right;" | 1749
+
| style="text-align: right;" | 1749.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-02-06
 
| 2001-02-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1722
+
| style="text-align: right;" | 1722.00
| style="text-align: right;" | 1730
+
| style="text-align: right;" | 1730.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-06
 
| 2001-02-06
 
| Perforation
 
| Perforation
| style="text-align: right;" | 497
+
| style="text-align: right;" | 497.00
| style="text-align: right;" | 498
+
| style="text-align: right;" | 498.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2001-02-07
 
| 2001-02-07
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 497
+
| style="text-align: right;" | 497.00
| style="text-align: right;" | 498
+
| style="text-align: right;" | 498.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1980-06-30
 +
| Perforation
 +
| style="text-align: right;" | 2352.50
 +
| style="text-align: right;" | 2359.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2001-02-07
 
| 2001-02-07
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 456
+
| style="text-align: right;" | 456.00
| style="text-align: right;" | 511
+
| style="text-align: right;" | 511.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-09-29
 
| 2002-09-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1568
+
| style="text-align: right;" | 1568.00
| style="text-align: right;" | 1572
+
| style="text-align: right;" | 1572.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-10-07
 
| 2002-10-07
| Fracture  
+
| Fracture
| style="text-align: right;" | 1568
+
| style="text-align: right;" | 1568.00
| style="text-align: right;" | 1572
+
| style="text-align: right;" | 1572.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-10-09
 
| 2002-10-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1560
+
| style="text-align: right;" | 1560.00
| style="text-align: right;" | 1568
+
| style="text-align: right;" | 1568.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-10-10
 
| 2002-10-10
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1535.5
+
| style="text-align: right;" | 1535.50
| style="text-align: right;" | 1537.5
+
| style="text-align: right;" | 1537.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-10-21
 
| 2002-10-21
| Fracture  
+
| Fracture
| style="text-align: right;" | 1535.5
+
| style="text-align: right;" | 1535.50
| style="text-align: right;" | 1537.5
+
| style="text-align: right;" | 1537.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 2346.00
 +
| style="text-align: right;" | 2359.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-09
 +
| Perforation
 +
| style="text-align: right;" | 2084.00
 +
| style="text-align: right;" | 2087.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1980-07-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 2084.00
 +
| style="text-align: right;" | 2087.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2084.00
 +
| style="text-align: right;" | 2087.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-16
 +
| Perforation
 +
| style="text-align: right;" | 2042.00
 +
| style="text-align: right;" | 2052.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1980-07-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 2042.00
 +
| style="text-align: right;" | 2052.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-17
 +
| Perforation
 +
| style="text-align: right;" | 2027.00
 +
| style="text-align: right;" | 2031.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 226: Line 365:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 275: Line 428:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:52, 17 January 2021

Well Details

Well ID: 0034241414002
Loading map...
Location: 00/14-14-003-24W4/2
Location Alias: 00/14-14-03-24 W4M
Location Alias 2: 00/14-14-003-24 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 24
Section: 14
County/Municipality: Cardston County
Well Name: RAIMOUNT ET AL WOOLFD 14-14-3-24
Operator Name: Raimount Energy Corp.
License Number: 0082141
License Date: 1980-04-15
License Status: Issued
Spud Date: 1980-04-20
Final Drill Date: 1980-06-05
Well Total Depth: 2610.00 m
Surface Hole Latitude: 49.214414
Surface Hole Longitude: -113.134451

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-15 Obtained License
1980-05-17 Drill Stem Test Performed
1980-06-03 Kick Occurred
1980-06-05 Finished Drilling
1980-06-08 Production Casing Operation Performed
1980-06-30 Perforation Treatment Performed - Jet Perforation
1980-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-09 Perforation Treatment Performed - Jet Perforation
1980-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-12 Perforation Treatment Performed - Cement Squeeze
1980-07-16 Perforation Treatment Performed - Jet Perforation
1980-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-17 Perforation Treatment Performed - Jet Perforation
1980-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-13 Perforation Treatment Performed - Fractured
1981-08-26 Perforation Treatment Performed - Jet Perforation
1981-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-09 Well Mode changed to Drilled and Cased
2001-02-02 Perforation Treatment Performed - Cement Plug
2001-02-02 Plug Back Performed
2001-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-03 Well Log Performed
2001-02-04 Perforation Treatment Performed - Jet Perforation
2001-02-04 Well Log Performed
2001-02-05 Well Log Performed
2001-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-06 Perforation Treatment Performed - Jet Perforation
2001-02-06 Plug Back Performed
2001-02-06 Well Log Performed
2001-02-06 Well Mode changed to Abandoned Zone
2001-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-07 Perforation Treatment Performed - Remedial Casing
2002-09-29 Perforation Treatment Performed - Jet Perforation
2002-10-07 Perforation Treatment Performed - Fractured
2002-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-09 Plug Back Performed
2002-10-10 Perforation Treatment Performed - Jet Perforation
2002-10-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-30 Perforation 2346.00 2352.00 7
1980-07-19 Acid Treatment 2027.00 2052.00 0
1980-08-13 Fracture 2346.00 2359.00 0
1981-08-26 Perforation 2036.00 2040.00 13
1981-08-27 Acid Treatment 2036.00 2040.00 0
2001-02-02 Cement Plug 1940.00 2198.40 0
2001-02-03 Packing Device Capped w/Cement 1904.00 1912.00 0
2001-02-04 Perforation 1741.00 1749.00 14
2001-02-06 Packing Device Capped w/Cement 1722.00 1730.00 0
2001-02-06 Perforation 497.00 498.00 20
2001-02-07 Remedial Casing Cementing 497.00 498.00 0
1980-06-30 Perforation 2352.50 2359.00 7
2001-02-07 Packing Device Capped w/Cement 456.00 511.00 0
2002-09-29 Perforation 1568.00 1572.00 17
2002-10-07 Fracture 1568.00 1572.00 0
2002-10-09 Packing Device Capped w/Cement 1560.00 1568.00 0
2002-10-10 Perforation 1535.50 1537.50 17
2002-10-21 Fracture 1535.50 1537.50 0
1980-07-03 Acid Treatment 2346.00 2359.00 0
1980-07-09 Perforation 2084.00 2087.00 13
1980-07-10 Acid Treatment 2084.00 2087.00 0
1980-07-12 Cement Squeeze 2084.00 2087.00 0
1980-07-16 Perforation 2042.00 2052.00 7
1980-07-17 Acid Treatment 2042.00 2052.00 0
1980-07-17 Perforation 2027.00 2031.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-06-03 Kick 2555.00 2555.00

For data sources see[5]

References