X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034130106002

Well Details

Well ID: 0034130106002
Loading map...
Location: 00/06-01-003-13W4/2
Location Alias: 00/06-01-03-13 W4M
Location Alias 2: 00/06-01-003-13 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 13
Section: 01
County/Municipality: County of Warner No. 5
Well Name: PIPER FAITH 6-1-3-13
Operator Name: Bellatrix Exploration Ltd.
License Number: 0258552
License Date: 2001-08-14
License Status: Suspension
Spud Date: 2001-08-22
Final Drill Date: 2001-08-24
Well Total Depth: 829.00 m
Surface Hole Latitude: 49.178106
Surface Hole Longitude: -111.635432

For data sources see[1][2]

Well History

Date Event
2001-08-14 Obtained License
2001-08-23 Surface Casing Operation Performed
2001-08-24 Finished Drilling
2001-08-24 Well Mode changed to Drilled and Cased
2001-08-25 Production Casing Operation Performed
2001-08-25 Rig Released
2001-08-25 Well Log Performed
2001-08-28 Well Log Performed
2001-09-10 Perforation Treatment Performed - Jet Perforation
2001-09-10 Well Log Performed
2001-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-16 Perforation Treatment Performed - Jet Perforation
2001-09-16 Plug Back Performed
2001-09-16 Well Log Performed
2001-09-29 Perforation Treatment Performed - Fractured
2001-09-30 Perforation Treatment Performed - Jet Perforation
2001-10-06 Perforation Treatment Performed - Fractured
2001-10-08 Well Log Performed
2003-02-14 Well Began Production
2003-02-14 Well Fluid changed to Gas
2003-02-14 Well Mode changed to Flowing
2014-02-01 Well Fluid changed to Gas
2014-02-01 Well Mode changed to Flowing
2017-06-08 Well Fluid changed to Gas
2017-06-08 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-10 Perforation 565.00 566.00 13
2001-09-16 Packing Device Capped w/Cement 542.00 550.00 0
2001-09-16 Perforation 459.00 460.00 13
2001-09-29 Fracture 459.00 460.00 0
2001-09-30 Perforation 410.00 412.00 13
2001-10-06 Fracture 410.00 412.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 7155 0.0 0.0 0.0
2004 8587 0.0 0.0 0.0
2005 8672 0.0 0.0 0.0
2006 8748 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8693 0.0 0.0 0.0
2010 7282 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 6618 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 8556 0.0 0.0 0.0
2016 1296 0.0 0.0 0.0

For data sources see[5]

References