X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034100307000

Well Details

Well ID: 0034100307000
Loading map...
Location: 00/07-03-003-10W4/0
Location Alias: 00/07-03-03-10 W4M
Location Alias 2: 00/07-03-003-10 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 10
Section: 03
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF SMICO 7-3-3-10
Operator Name: Pine Cliff Energy Ltd.
License Number: B0001752
License Date: 1947-07-19
License Status: Issued
Spud Date: 1947-07-18
Final Drill Date: 1947-08-04
Well Total Depth: 609.90 m
Surface Hole Latitude: 49.180144
Surface Hole Longitude: -111.271342

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-07-19 Obtained License
1947-07-30 Drill Stem Test Performed
1947-08-01 Drill Stem Test Performed
1947-08-02 Drill Stem Test Performed
1947-08-04 Drill Stem Test Performed
1947-08-04 Finished Drilling
1947-08-04 Well Mode changed to Drilled and Cased
1947-08-05 Production Casing Operation Performed
1947-08-09 Perforation Treatment Performed - Bullet Perforation
1947-08-11 Perforation Treatment Performed - Bullet Perforation
1952-02-10 Well Began Production
1952-02-10 Well Fluid changed to Gas
1952-02-10 Well Mode changed to Flowing
1952-06-01 Perforation Treatment Performed - Bullet Perforation
1952-06-01 Perforation Treatment Performed - Cement Plug
1952-10-01 Perforation Treatment Performed - Bullet Perforation
1952-10-01 Perforation Treatment Performed - Cement Squeeze
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-10-15 Well Fluid changed to Gas
1983-10-15 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1947-08-09 Bullet Perforation 559.60 562.10 13
1947-08-11 Bullet Perforation 557.50 558.10 13
1952-06-01 Cement Plug 558.70 562.10 0
1952-06-01 Bullet Perforation 558.70 561.10 13
1952-10-01 Cement Squeeze 557.50 561.10 0
1952-10-01 Bullet Perforation 559.60 560.80 16

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1458 0.0 0.0 0.0
1969 8124 0.0 0.0 0.0
1970 8415 0.0 0.0 0.0
1971 8583 0.0 0.0 0.0
1972 7980 0.0 0.0 0.0
1973 8557 0.0 0.0 0.0
1974 8316 0.0 0.0 0.0
1975 3551 0.0 0.0 0.0
1976 8548 0.0 0.0 0.0
1977 8209 0.0 0.0 0.0
1978 2124 0.0 0.0 0.0
1979 194 0.0 0.0 0.0
1980 3593 0.0 0.0 0.0
1981 2403 0.0 0.0 0.0
1983 1394 0.0 0.0 0.0
1984 7404 0.0 0.0 0.0
1985 8367 0.0 0.0 0.0
1986 8035 0.0 0.0 0.0
1987 4947 0.0 0.0 0.0
1988 3256 0.0 0.0 0.0
1989 5948 0.0 0.0 0.0
1990 4917 0.0 0.0 0.0
1991 6755 0.0 0.0 0.0
1992 4014 0.0 0.0 0.0
1993 7059 0.0 0.0 0.0
1994 6749 0.0 0.0 0.0
1995 8298 0.0 0.0 0.0
1996 8430 0.0 0.0 0.0
1997 8357 0.0 0.0 0.0
1998 8621 0.0 0.0 0.0
1999 6402 0.0 0.0 0.0
2000 5835 0.0 0.0 0.0
2001 8252 0.0 0.0 0.0
2002 8383 0.0 0.0 0.0
2003 8615 0.0 0.0 0.0
2004 7240 0.0 0.0 0.0
2005 8652 0.0 0.0 0.0
2006 8521 0.0 0.0 0.0
2007 8084 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References