X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034082310003

Well Details

Well ID: 0034082310003
Loading map...
Location: 00/10-23-003-08W4/3
Location Alias: 00/10-23-03-08 W4M
Location Alias 2: 00/10-23-003-08 W4/03
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 23
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 10-23-3-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0050537
License Date: 1974-07-19
License Status: Amended
Spud Date: 1974-08-06
Final Drill Date: 1987-04-29
Well Total Depth: 683.00 m
Surface Hole Latitude: 49.226504
Surface Hole Longitude: -110.978405

For data sources see[1][2]

Well History

Date Event
1974-07-19 Obtained License
1974-08-16 Perforation Treatment Performed - Selective Bullet Perforations
1974-08-26 Perforation Treatment Performed - Selective Bullet Perforations
1974-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-10-05 Perforation Treatment Performed - Jet Perforation
1987-03-04 Well Log Performed
1987-04-21 Perforation Treatment Performed - Selective Bullet Perforations
1987-04-22 Perforation Treatment Performed - Selective Bullet Perforations
1987-04-29 Finished Drilling
1987-04-29 Perforation Treatment Performed - Cement Squeeze
1987-04-29 Perforation Treatment Performed - Open-Hole Completion
1987-04-29 Production Casing Operation Performed
1987-04-29 Rig Released
1987-04-29 Well Log Performed
1987-04-29 Well Mode changed to Drilled and Cased
1987-05-04 Well Log Performed
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-18 Perforation Treatment Performed - Jet Perforation
1988-01-08 Well Began Production
1988-01-08 Well Fluid changed to Gas
1988-01-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-16 Selective Bullet Perforations 503.80 573.00 0
1987-04-29 Cement Squeeze 313.90 324.90 0
1987-04-29 Cement Squeeze 187.50 188.10 0
1987-06-11 Perforation 665.00 666.50 13
1987-06-18 Perforation 650.00 652.00 13
1974-08-26 Selective Bullet Perforations 313.90 324.90 0
1974-10-04 Packing Device Capped w/Cement 494.70 494.70 0
1974-10-05 Packing Device Capped w/Cement 310.90 310.90 0
1974-10-05 Perforation 187.50 188.10 3
1987-04-21 Selective Bullet Perforations 313.90 324.90 0
1987-04-22 Selective Bullet Perforations 503.80 573.00 0
1987-04-29 Open Hole/Barefoot Completion 581.30 683.00 0
1987-04-29 Cement Squeeze 503.80 683.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2478 0.0 0.0 0.0
1989 8557 0.0 0.0 0.0
1990 5483 0.0 0.0 0.0
1991 7704 0.0 0.0 0.0
1992 5161 0.0 0.0 0.0
1993 7061 0.0 0.0 0.0
1994 6745 0.0 0.0 0.0
1995 8372 0.0 0.0 0.0
1996 8618 0.0 0.0 0.0
1997 8564 0.0 0.0 0.0
1998 8699 0.0 0.0 0.0
1999 8754 0.0 0.0 0.0
2000 8760 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 8743 0.0 0.0 0.0
2003 8758 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8727 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8327 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References