X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034082111002

Well Details

Well ID: 0034082111002
Loading map...
Location: 00/11-21-003-08W4/2
Location Alias: 00/11-21-03-08 W4M
Location Alias 2: 00/11-21-003-08 W4/02
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 21
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 11-21-3-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0005139
License Date: 1952-08-15
License Status: Suspension
Spud Date: 1952-09-11
Final Drill Date: 1952-09-20
Well Total Depth: 676.70 m
Surface Hole Latitude: 49.225536
Surface Hole Longitude: -111.027480

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-15 Obtained License
1952-09-01 Production Casing Operation Performed
1952-09-15 Drill Stem Test Performed
1952-09-16 Drill Stem Test Performed
1952-09-17 Drill Stem Test Performed
1952-09-18 Drill Stem Test Performed
1952-09-20 Drill Stem Test Performed
1952-09-20 Finished Drilling
1952-09-20 Well Mode changed to Drilled and Cased
1952-10-27 Perforation Treatment Performed - Bullet Perforation
1957-11-27 Perforation Treatment Performed - Bullet Perforation
1957-11-27 Perforation Treatment Performed - Fractured
1984-01-01 Well Began Production
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
1990-06-20 Well Log Performed
1990-07-04 Perforation Treatment Performed - Jet Perforation
1990-07-04 Perforation Treatment Performed - Remedial Casing
1990-07-04 Well Log Performed
2003-01-24 Well Structure changed to Commingled
2003-07-30 Well Log Performed
2003-07-31 Perforation Treatment Performed - Jet Perforation
2003-07-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-27 Bullet Perforation 609.90 613.00 13
1957-11-27 Bullet Perforation 651.40 652.90 13
1957-11-27 Bullet Perforation 635.20 636.70 13
1957-11-27 Fracture 635.20 636.70 0
1990-07-04 Perforation 315.00 315.30 7
1990-07-04 Remedial Casing Cementing 315.00 315.30 0
2003-07-31 Perforation 609.90 615.40 17
2003-07-31 Perforation 651.40 654.90 17
2003-07-31 Perforation 635.20 637.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 762 0.0 0.0 0.0
1983 1464 0.0 0.0 0.0
1984 8390 0.0 0.0 0.0
1985 8618 0.0 0.0 0.0
1986 8310 0.0 0.0 0.0
1987 4144 0.0 0.0 0.0
1988 7673 0.0 0.0 0.0
1989 8342 0.0 0.0 0.0
1990 4741 0.0 0.0 0.0
1991 7887 0.0 0.0 0.0
1992 4923 0.0 0.0 0.0
1993 8717 0.0 0.0 0.0
1994 8414 0.0 0.0 0.0
1995 8634 0.0 0.0 0.0
1996 8573 0.0 0.0 0.0
1997 8463 0.0 0.0 0.0
1998 8651 0.0 0.0 0.0
1999 8671 0.0 0.0 0.0
2000 8771 0.0 0.0 0.0
2001 8757 0.0 0.0 0.0
2002 4700 0.0 0.0 0.0

For data sources see[5]

References