X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0034081707000

Well Details

Well ID: 0034081707000
Loading map...
Location: 00/07-17-003-08W4/0
Location Alias: 00/07-17-03-08 W4M
Location Alias 2: 00/07-17-003-08 W4/00
Country: Canada
Province: Alberta
Township: 003
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 7-17-3-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0020792
License Date: 1961-05-25
License Status: Abandoned
Spud Date: 1961-05-30
Final Drill Date: 1961-07-19
Well Total Depth: 2034.50 m
Surface Hole Latitude: 49.208308
Surface Hole Longitude: -111.045707

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-25 Obtained License
1961-06-01 Production Casing Operation Performed
1961-06-07 Drill Stem Test Performed
1961-06-08 Drill Stem Test Performed
1961-06-11 Drill Stem Test Performed
1961-06-17 Drill Stem Test Performed
1961-06-20 Drill Stem Test Performed
1961-06-22 Drill Stem Test Performed
1961-06-23 Drill Stem Test Performed
1961-06-24 Drill Stem Test Performed
1961-06-27 Drill Stem Test Performed
1961-06-29 Drill Stem Test Performed
1961-07-01 Drill Stem Test Performed
1961-07-03 Drill Stem Test Performed
1961-07-15 Drill Stem Test Performed
1961-07-19 Finished Drilling
1961-07-21 Drill Stem Test Performed
1961-08-05 Perforation Treatment Performed - Jet Perforation
1961-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-08 Perforation Treatment Performed - Fractured
1961-08-17 Perforation Treatment Performed - Cement Squeeze
1961-08-22 Perforation Treatment Performed - Jet Perforation
1961-08-23 Perforation Treatment Performed - Fractured
1961-08-25 Perforation Treatment Performed - Jet Perforation
1961-08-27 Perforation Treatment Performed - Cement Plug
1961-08-27 Well Mode changed to Drilled and Cased
1961-11-01 Well Began Production
1961-11-01 Well Fluid changed to Gas
1961-11-01 Well Mode changed to Flowing
1980-10-10 Well Fluid changed to Gas
1980-10-10 Well Mode changed to Suspended
1981-11-23 Well Fluid changed to Gas
1981-11-23 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-08-01 Well Fluid changed to Gas
1983-08-01 Well Mode changed to Flowing
1983-10-07 Well Fluid changed to Gas
1983-10-07 Well Mode changed to Suspended
1983-10-15 Well Fluid changed to Gas
1983-10-15 Well Mode changed to Flowing
1992-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-15 Plug Back Performed
1992-11-15 Well Fluid changed to Gas
1992-11-15 Well Mode changed to Abandoned Zone
1993-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-22 Plug Back Performed
1993-10-23 Perforation Treatment Performed - Jet Perforation
1993-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-25 Perforation Treatment Performed - Jet Perforation
1993-10-25 Plug Back Performed
1993-10-31 Perforation Treatment Performed - Fractured
1998-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-01 Perforation Treatment Performed - Jet Perforation
1998-09-01 Plug Back Performed
1998-09-01 Well Log Performed
1998-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-02 Perforation Treatment Performed - Remedial Casing
1998-09-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-08-05 Perforation 768.70 771.10 13
1992-11-15 Packing Device Capped w/Cement 824.00 832.00 0
1993-10-22 Packing Device Capped w/Cement 737.00 745.00 0
1993-10-23 Perforation 612.60 613.60 13
1993-10-23 Perforation 615.50 617.30 13
1993-10-23 Perforation 635.20 635.80 13
1993-10-25 Packing Device Capped w/Cement 594.00 602.00 0
1993-10-25 Perforation 511.00 512.00 13
1993-10-31 Fracture 511.00 512.00 0
1998-09-01 Packing Device Capped w/Cement 495.00 503.00 0
1998-09-01 Perforation 306.50 307.50 13
1961-08-05 Perforation 755.30 765.00 13
1998-09-02 Remedial Casing Cementing 306.50 307.50 0
1998-09-02 Packing Device Capped w/Cement 244.00 300.00 0
1961-08-08 Acid Treatment 755.30 771.10 0
1961-08-08 Fracture 755.30 771.10 0
1961-08-17 Cement Squeeze 768.70 771.10 0
1961-08-22 Perforation 782.70 786.40 13
1961-08-23 Fracture 782.70 786.40 0
1961-08-25 Perforation 845.50 853.10 13
1961-08-27 Cement Plug 914.40 951.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1462 0.0 0.0 0.0
1969 8247 0.0 0.0 0.0
1970 8091 0.0 0.0 0.0
1971 6727 0.0 0.0 0.0
1972 7609 0.0 0.0 0.0
1973 8634 0.0 0.0 0.0
1974 8291 0.0 0.0 0.0
1975 6012 0.0 0.0 0.0
1976 8417 0.0 0.0 0.0
1977 6036 0.0 0.0 0.0
1978 5270 0.0 0.0 0.0
1979 3503 0.0 0.0 0.0
1981 905 0.0 0.0 0.0
1983 2398 0.0 0.0 0.0
1984 3070 0.0 0.0 0.0
1985 4385 0.0 0.0 0.0
1986 3134 0.0 0.0 0.0
1987 3940 0.0 0.0 0.0
1988 5321 0.0 0.0 0.0
1989 4115 0.0 0.0 0.0
1990 203 0.0 0.0 0.0

For data sources see[5]

References