X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0024212405000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0024212405000
 
| Well ID: 0024212405000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.12177200000002131, -112.69703899999996111 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.121772, -112.697039 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-24-002-21W4/0
 
| Location: 00/05-24-002-21W4/0
 +
|-
 +
| Location Alias: 00/05-24-02-21 W4M
 +
|-
 +
| Location Alias 2: 00/05-24-002-21 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 002
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 21
 +
|-
 +
| Section: 24
 +
|-
 +
| County/Municipality: [[Cardston County,_Alberta|Cardston County]]
 
|-
 
|-
 
| Well Name: CPEC REAGAN 5-24-2-21
 
| Well Name: CPEC REAGAN 5-24-2-21
 +
|-
 +
| Operator Name: [[Crescent Point Energy Corp.]]
 +
|-
 +
| License Number: 0444592
 
|-
 
|-
 
| License Date: 2012-03-01
 
| License Date: 2012-03-01
 
|-
 
|-
| Final Drilling Date: 2012-04-11
+
| License Status: Amended
 +
|-
 +
| Spud Date: 2012-03-13
 +
|-
 +
| Final Drill Date: 2012-04-11
 +
|-
 +
| Well Total Depth: 3113.00 m
 +
|-
 +
| Surface Hole Latitude: 49.121772
 +
|-
 +
| Surface Hole Longitude: -112.697039
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-03-01
 +
| Obtained License
 +
|-
 +
| 2012-03-15
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-03-18
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-03-23
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-03-25
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2012-03-25
 +
| Well Log Performed
 
|-
 
|-
| Total Depth: 3113.0m
+
| 2012-04-11
 +
| Finished Drilling
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2012-04-11
 +
| Well Log Performed
 
|-
 
|-
| Status: Pumping
+
| 2012-04-11
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-04-13
 +
| Liner Casing Operation Performed
 
|-
 
|-
| Configuration: Horizontal
+
| 2012-04-13
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 49.12177200000002131
+
| 2012-04-14
 +
| Rig Released
 
|-
 
|-
| Longitude: -112.69703899999996111
+
| 2012-05-08
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
 +
| 2012-05-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-24
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-25
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-26
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-27
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-28
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-29
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-30
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-05-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-05-31
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-06-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-06-01
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-07-01
 +
| Well Began Production
 +
|-
 +
| 2012-07-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2012-07-01
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2014-03-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2014-03-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2014-05-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2014-05-01
 +
| Well Mode changed to Pumping
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-03-18
 +
| style="text-align: right;" | 1416.20
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-03-23
 +
| style="text-align: right;" | 1708.10
 +
| Horizontal
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-05-08
 +
| Perforation
 +
| style="text-align: right;" | 3095.00
 +
| style="text-align: right;" | 3096.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-24
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3095.00
 +
| style="text-align: right;" | 3096.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-24
 +
| Perforation
 +
| style="text-align: right;" | 3005.00
 +
| style="text-align: right;" | 3006.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-25
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3005.00
 +
| style="text-align: right;" | 3006.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-25
 +
| Perforation
 +
| style="text-align: right;" | 2949.00
 +
| style="text-align: right;" | 2950.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-25
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2949.00
 +
| style="text-align: right;" | 2950.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-25
 +
| Perforation
 +
| style="text-align: right;" | 2938.00
 +
| style="text-align: right;" | 2939.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-26
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2938.00
 +
| style="text-align: right;" | 2939.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2895.00
 +
| style="text-align: right;" | 2896.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-26
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2895.00
 +
| style="text-align: right;" | 2896.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2847.00
 +
| style="text-align: right;" | 2848.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-26
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2847.00
 +
| style="text-align: right;" | 2848.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2793.00
 +
| style="text-align: right;" | 2794.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2793.00
 +
| style="text-align: right;" | 2794.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-27
 +
| Perforation
 +
| style="text-align: right;" | 2745.00
 +
| style="text-align: right;" | 2746.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2745.00
 +
| style="text-align: right;" | 2746.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-27
 +
| Perforation
 +
| style="text-align: right;" | 2691.00
 +
| style="text-align: right;" | 2692.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-27
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2691.00
 +
| style="text-align: right;" | 2692.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-28
 +
| Perforation
 +
| style="text-align: right;" | 2645.00
 +
| style="text-align: right;" | 2646.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2645.00
 +
| style="text-align: right;" | 2646.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-28
 +
| Perforation
 +
| style="text-align: right;" | 2597.00
 +
| style="text-align: right;" | 2598.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2597.00
 +
| style="text-align: right;" | 2598.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-28
 +
| Perforation
 +
| style="text-align: right;" | 2552.00
 +
| style="text-align: right;" | 2553.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-28
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2552.00
 +
| style="text-align: right;" | 2553.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-28
 +
| Perforation
 +
| style="text-align: right;" | 2496.00
 +
| style="text-align: right;" | 2497.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2496.00
 +
| style="text-align: right;" | 2497.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-29
 +
| Perforation
 +
| style="text-align: right;" | 2452.00
 +
| style="text-align: right;" | 2453.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2452.00
 +
| style="text-align: right;" | 2453.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-29
 +
| Perforation
 +
| style="text-align: right;" | 2395.00
 +
| style="text-align: right;" | 2396.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2395.00
 +
| style="text-align: right;" | 2396.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-29
 +
| Perforation
 +
| style="text-align: right;" | 2348.00
 +
| style="text-align: right;" | 2349.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-29
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2348.00
 +
| style="text-align: right;" | 2349.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-30
 +
| Perforation
 +
| style="text-align: right;" | 2295.00
 +
| style="text-align: right;" | 2296.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2295.00
 +
| style="text-align: right;" | 2296.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-30
 +
| Perforation
 +
| style="text-align: right;" | 2241.00
 +
| style="text-align: right;" | 2242.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2241.00
 +
| style="text-align: right;" | 2242.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-30
 +
| Perforation
 +
| style="text-align: right;" | 2195.00
 +
| style="text-align: right;" | 2196.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-30
 +
| Perforation
 +
| style="text-align: right;" | 2185.00
 +
| style="text-align: right;" | 2186.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2185.00
 +
| style="text-align: right;" | 2186.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-31
 +
| Perforation
 +
| style="text-align: right;" | 2148.00
 +
| style="text-align: right;" | 2149.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2148.00
 +
| style="text-align: right;" | 2149.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-31
 +
| Perforation
 +
| style="text-align: right;" | 2097.00
 +
| style="text-align: right;" | 2098.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2097.00
 +
| style="text-align: right;" | 2098.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-31
 +
| Perforation
 +
| style="text-align: right;" | 2045.00
 +
| style="text-align: right;" | 2046.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-05-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2045.00
 +
| style="text-align: right;" | 2046.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-05-31
 +
| Perforation
 +
| style="text-align: right;" | 1997.00
 +
| style="text-align: right;" | 1998.00
 +
| style="text-align: right;" | 21
 +
|-
 +
| 2012-05-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1997.00
 +
| style="text-align: right;" | 1998.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-01
 +
| Perforation
 +
| style="text-align: right;" | 1942.00
 +
| style="text-align: right;" | 1943.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-06-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1942.00
 +
| style="text-align: right;" | 1943.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-01
 +
| Perforation
 +
| style="text-align: right;" | 1897.00
 +
| style="text-align: right;" | 1898.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-06-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1897.00
 +
| style="text-align: right;" | 1898.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 2805
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 4597
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 3156
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 244
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 406
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 387
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 582
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-03-13
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-07-30
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 21:02, 7 July 2020

Well Details

Well ID: 0024212405000
Loading map...
Location: 00/05-24-002-21W4/0
Location Alias: 00/05-24-02-21 W4M
Location Alias 2: 00/05-24-002-21 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 21
Section: 24
County/Municipality: Cardston County
Well Name: CPEC REAGAN 5-24-2-21
Operator Name: Crescent Point Energy Corp.
License Number: 0444592
License Date: 2012-03-01
License Status: Amended
Spud Date: 2012-03-13
Final Drill Date: 2012-04-11
Well Total Depth: 3113.00 m
Surface Hole Latitude: 49.121772
Surface Hole Longitude: -112.697039

For data sources see[1][2]

Well History

Date Event
2012-03-01 Obtained License
2012-03-15 Surface Casing Operation Performed
2012-03-18 Direction Drilling Operation Performed - Deviate
2012-03-23 Direction Drilling Operation Performed - Horizontal
2012-03-25 Intermediate Casing Operation Performed
2012-03-25 Well Log Performed
2012-04-11 Finished Drilling
2012-04-11 Well Log Performed
2012-04-11 Well Mode changed to Drilled and Cased
2012-04-13 Liner Casing Operation Performed
2012-04-13 Well Log Performed
2012-04-14 Rig Released
2012-05-08 Perforation Treatment Performed - Jet Perforation
2012-05-24 Perforation Treatment Performed - Jet Perforation
2012-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-25 Perforation Treatment Performed - Jet Perforation
2012-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-26 Perforation Treatment Performed - Jet Perforation
2012-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-27 Perforation Treatment Performed - Jet Perforation
2012-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-28 Perforation Treatment Performed - Jet Perforation
2012-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-29 Perforation Treatment Performed - Jet Perforation
2012-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-30 Perforation Treatment Performed - Jet Perforation
2012-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-31 Perforation Treatment Performed - Jet Perforation
2012-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-01 Perforation Treatment Performed - Jet Perforation
2012-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Crude Oil
2012-07-01 Well Mode changed to Pumping
2014-03-01 Well Fluid changed to Crude Oil
2014-03-01 Well Mode changed to Suspended
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-18 1416.20 Deviate (5 - 79 degrees)
2012-03-23 1708.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-08 Perforation 3095.00 3096.00 21
2012-05-24 Multi-Stage Fracture 3095.00 3096.00 0
2012-05-24 Perforation 3005.00 3006.00 21
2012-05-25 Multi-Stage Fracture 3005.00 3006.00 0
2012-05-25 Perforation 2949.00 2950.00 17
2012-05-25 Multi-Stage Fracture 2949.00 2950.00 0
2012-05-25 Perforation 2938.00 2939.00 21
2012-05-26 Multi-Stage Fracture 2938.00 2939.00 0
2012-05-26 Perforation 2895.00 2896.00 17
2012-05-26 Multi-Stage Fracture 2895.00 2896.00 0
2012-05-26 Perforation 2847.00 2848.00 17
2012-05-26 Multi-Stage Fracture 2847.00 2848.00 0
2012-05-26 Perforation 2793.00 2794.00 17
2012-05-27 Multi-Stage Fracture 2793.00 2794.00 0
2012-05-27 Perforation 2745.00 2746.00 17
2012-05-27 Multi-Stage Fracture 2745.00 2746.00 0
2012-05-27 Perforation 2691.00 2692.00 17
2012-05-27 Multi-Stage Fracture 2691.00 2692.00 0
2012-05-28 Perforation 2645.00 2646.00 17
2012-05-28 Multi-Stage Fracture 2645.00 2646.00 0
2012-05-28 Perforation 2597.00 2598.00 17
2012-05-28 Multi-Stage Fracture 2597.00 2598.00 0
2012-05-28 Perforation 2552.00 2553.00 17
2012-05-28 Multi-Stage Fracture 2552.00 2553.00 0
2012-05-28 Perforation 2496.00 2497.00 17
2012-05-29 Multi-Stage Fracture 2496.00 2497.00 0
2012-05-29 Perforation 2452.00 2453.00 17
2012-05-29 Multi-Stage Fracture 2452.00 2453.00 0
2012-05-29 Perforation 2395.00 2396.00 17
2012-05-29 Multi-Stage Fracture 2395.00 2396.00 0
2012-05-29 Perforation 2348.00 2349.00 17
2012-05-29 Multi-Stage Fracture 2348.00 2349.00 0
2012-05-30 Perforation 2295.00 2296.00 21
2012-05-30 Multi-Stage Fracture 2295.00 2296.00 0
2012-05-30 Perforation 2241.00 2242.00 17
2012-05-30 Multi-Stage Fracture 2241.00 2242.00 0
2012-05-30 Perforation 2195.00 2196.00 17
2012-05-30 Perforation 2185.00 2186.00 21
2012-05-31 Multi-Stage Fracture 2185.00 2186.00 0
2012-05-31 Perforation 2148.00 2149.00 21
2012-05-31 Multi-Stage Fracture 2148.00 2149.00 0
2012-05-31 Perforation 2097.00 2098.00 17
2012-05-31 Multi-Stage Fracture 2097.00 2098.00 0
2012-05-31 Perforation 2045.00 2046.00 17
2012-05-31 Multi-Stage Fracture 2045.00 2046.00 0
2012-05-31 Perforation 1997.00 1998.00 21
2012-05-31 Multi-Stage Fracture 1997.00 1998.00 0
2012-06-01 Perforation 1942.00 1943.00 17
2012-06-01 Multi-Stage Fracture 1942.00 1943.00 0
2012-06-01 Perforation 1897.00 1898.00 17
2012-06-01 Multi-Stage Fracture 1897.00 1898.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2805 0.0 0.0 0.0
2014 4597 0.0 0.0 0.0
2015 3156 0.0 0.0 0.0
2016 244 0.0 0.0 0.0
2017 406 0.0 0.0 0.0
2018 387 0.0 0.0 0.0
2019 582 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-13 No Incident Encountered 0.00 0.00
2012-07-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References