X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024093613003

Well Details

Well ID: 0024093613003
Loading map...
Location: 00/13-36-002-09W4/3
Location Alias: 00/13-36-02-09 W4M
Location Alias 2: 00/13-36-002-09 W4/03
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 09
Section: 36
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 13-36-2-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0398093
License Date: 2008-06-27
License Status: Amended
Spud Date: 2008-12-05
Final Drill Date: 2008-12-06
Well Total Depth: 869.00 m
Surface Hole Latitude: 49.170069
Surface Hole Longitude: -111.092581

For data sources see[1][2]

Well History

Date Event
2008-06-27 Obtained License
2008-12-05 Surface Casing Operation Performed
2008-12-06 Finished Drilling
2008-12-06 Well Log Performed
2008-12-06 Well Mode changed to Drilled and Cased
2008-12-07 Production Casing Operation Performed
2008-12-07 Rig Released
2009-01-14 Perforation Treatment Performed - Jet Perforation
2009-01-14 Well Log Performed
2009-01-19 Perforation Treatment Performed - Jet Perforation
2009-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-04 Perforation Treatment Performed - Jet Perforation
2009-02-04 Plug Back Performed
2009-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-12 Perforation Treatment Performed - Jet Perforation
2009-02-12 Plug Back Performed
2009-02-18 Perforation Treatment Performed - Fractured
2009-12-17 Well Began Production
2009-12-17 Well Fluid changed to Gas
2009-12-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-14 Perforation 830.50 833.00 13
2009-01-19 Perforation 824.00 827.00 13
2009-02-04 Packing Device Capped w/Cement 812.00 820.00 0
2009-02-04 Perforation 605.00 607.00 13
2009-02-12 Packing Device Capped w/Cement 592.00 600.00 0
2009-02-12 Perforation 486.00 490.00 13
2009-02-12 Perforation 479.00 484.00 13
2009-02-18 Fracture 479.00 490.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 360 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References