X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024083513004

Well Details

Well ID: 0024083513004
Loading map...
Location: 00/13-35-002-08W4/4
Location Alias: 00/13-35-02-08 W4M
Location Alias 2: 00/13-35-002-08 W4/04
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 08
Section: 35
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 13-35-2-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0401431
License Date: 2008-09-25
License Status: Issued
Spud Date: 2008-11-19
Final Drill Date: 2008-11-20
Well Total Depth: 887.30 m
Surface Hole Latitude: 49.170403
Surface Hole Longitude: -110.980310

For data sources see[1][2]

Well History

Date Event
2008-09-25 Obtained License
2008-11-19 Surface Casing Operation Performed
2008-11-20 Finished Drilling
2008-11-20 Well Log Performed
2008-11-20 Well Mode changed to Drilled and Cased
2008-11-21 Production Casing Operation Performed
2008-11-21 Rig Released
2008-12-04 Well Log Performed
2008-12-08 Perforation Treatment Performed - Jet Perforation
2009-01-20 Perforation Treatment Performed - Jet Perforation
2009-02-02 Perforation Treatment Performed - Jet Perforation
2009-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-12 Perforation Treatment Performed - Jet Perforation
2009-02-12 Plug Back Performed
2009-02-21 Perforation Treatment Performed - Jet Perforation
2009-02-28 Perforation Treatment Performed - Jet Perforation
2009-03-03 Perforation Treatment Performed - Jet Perforation
2009-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-06 Perforation Treatment Performed - Jet Perforation
2009-03-06 Plug Back Performed
2009-03-10 Perforation Treatment Performed - Fractured
2009-03-16 Well Began Production
2009-03-16 Well Fluid changed to Gas
2009-03-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-08 Perforation 854.00 856.50 13
2009-03-06 Perforation 305.00 307.00 13
2009-03-06 Packing Device Capped w/Cement 607.00 615.00 0
2009-03-10 Fracture 305.00 307.00 0
2009-01-20 Perforation 850.50 851.50 13
2009-02-02 Perforation 837.50 842.00 13
2009-02-12 Perforation 653.50 657.50 13
2009-02-12 Packing Device Capped w/Cement 824.00 832.00 0
2009-02-12 Packing Device Capped w/Cement 845.00 853.00 0
2009-02-21 Perforation 648.00 651.00 13
2009-02-28 Perforation 627.00 631.00 13
2009-03-03 Perforation 622.00 624.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6912 0.0 0.0 0.0
2010 6119 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References