X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024083513000

Well Details

Well ID: 0024083513000
Loading map...
Location: 00/13-35-002-08W4/0
Location Alias: 00/13-35-02-08 W4M
Location Alias 2: 00/13-35-002-08 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 08
Section: 35
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 13-35-2-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0401431
License Date: 2008-09-25
License Status: Issued
Spud Date: 2008-11-19
Final Drill Date: 2008-11-20
Well Total Depth: 887.30 m
Surface Hole Latitude: 49.170403
Surface Hole Longitude: -110.980310

For data sources see[1][2]

Well History

Date Event
2008-09-25 Obtained License
2008-11-19 Surface Casing Operation Performed
2008-11-20 Finished Drilling
2008-11-20 Well Log Performed
2008-11-20 Well Mode changed to Drilled and Cased
2008-11-21 Production Casing Operation Performed
2008-11-21 Rig Released
2008-12-04 Well Log Performed
2008-12-08 Perforation Treatment Performed - Jet Perforation
2009-01-20 Perforation Treatment Performed - Jet Perforation
2009-02-02 Perforation Treatment Performed - Jet Perforation
2009-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-12 Perforation Treatment Performed - Jet Perforation
2009-02-12 Plug Back Performed
2009-02-12 Well Mode changed to Abandoned Zone
2009-02-21 Perforation Treatment Performed - Jet Perforation
2009-02-28 Perforation Treatment Performed - Jet Perforation
2009-03-03 Perforation Treatment Performed - Jet Perforation
2009-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-06 Perforation Treatment Performed - Jet Perforation
2009-03-06 Plug Back Performed
2009-03-10 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-08 Perforation 854.00 856.50 13
2009-03-06 Perforation 305.00 307.00 13
2009-03-06 Packing Device Capped w/Cement 607.00 615.00 0
2009-03-10 Fracture 305.00 307.00 0
2009-01-20 Perforation 850.50 851.50 13
2009-02-02 Perforation 837.50 842.00 13
2009-02-12 Perforation 653.50 657.50 13
2009-02-12 Packing Device Capped w/Cement 824.00 832.00 0
2009-02-12 Packing Device Capped w/Cement 845.00 853.00 0
2009-02-21 Perforation 648.00 651.00 13
2009-02-28 Perforation 627.00 631.00 13
2009-03-03 Perforation 622.00 624.00 13

For data sources see[4]



References