X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024082611000

Well Details

Well ID: 0024082611000
Loading map...
Location: 00/11-26-002-08W4/0
Location Alias: 00/11-26-02-08 W4M
Location Alias 2: 00/11-26-002-08 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 08
Section: 26
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 11-26-2-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0044072
License Date: 1972-11-07
License Status: Abandoned
Spud Date: 1972-11-13
Final Drill Date: 1972-11-19
Well Total Depth: 981.50 m
Surface Hole Latitude: 49.155411
Surface Hole Longitude: -110.974487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-07 Obtained License
1972-11-14 Drill Stem Test Performed
1972-11-15 Drill Stem Test Performed
1972-11-19 Drill Stem Test Performed
1972-11-19 Finished Drilling
1972-11-19 Well Mode changed to Drilled and Cased
1972-11-20 Drill Stem Test Performed
1972-11-22 Production Casing Operation Performed
1972-11-30 Perforation Treatment Performed - Jet Perforation
1973-05-17 Well Began Production
1973-05-17 Well Fluid changed to Gas
1973-05-17 Well Mode changed to Flowing
1975-01-04 Perforation Treatment Performed - Jet Perforation
1975-01-05 Perforation Treatment Performed - Cement Squeeze
1975-01-07 Perforation Treatment Performed - Jet Perforation
1975-05-13 Perforation Treatment Performed - Jet Perforation
1977-01-27 Well Fluid changed to Gas
1977-01-27 Well Mode changed to Suspended
1978-06-19 Well Fluid changed to Gas
1978-06-19 Well Mode changed to Flowing
1979-09-18 Well Fluid changed to Gas
1979-09-18 Well Mode changed to Suspended
1987-04-20 Perforation Treatment Performed - Cement Squeeze
1987-04-23 Perforation Treatment Performed - Jet Perforation
1987-04-24 Perforation Treatment Performed - Jet Perforation
1997-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-14 Plug Back Performed
1997-07-14 Well Fluid changed to Gas
1997-07-14 Well Mode changed to Abandoned Zone
1997-07-25 Well Abandoned
1997-07-25 Well Fluid changed to Gas
1997-07-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-30 Perforation 865.60 866.90 7
1997-07-14 Packing Device Capped w/Cement 839.00 847.00 0
1975-01-04 Perforation 878.70 879.00 13
1975-01-05 Cement Squeeze 865.60 866.90 0
1975-01-07 Perforation 865.90 866.90 7
1975-05-13 Perforation 867.50 868.10 10
1975-05-13 Perforation 868.40 869.00 10
1987-04-20 Cement Squeeze 865.90 869.00 0
1987-04-23 Perforation 864.40 865.60 13
1987-04-24 Perforation 865.60 866.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 5398 0.0 0.0 0.0
1974 7758 0.0 0.0 0.0
1975 2851 0.0 0.0 0.0

For data sources see[5]

References