X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024073410000

Well Details

Well ID: 0024073410000
Loading map...
Location: 00/10-34-002-07W4/0
Location Alias: 00/10-34-02-07 W4M
Location Alias 2: 00/10-34-002-07 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 34
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 10-34-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0036402
License Date: 1969-06-20
License Status: Suspension
Spud Date: 1969-07-16
Final Drill Date: 1969-07-21
Well Total Depth: 1018.00 m
Surface Hole Latitude: 49.170064
Surface Hole Longitude: -110.857953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-06-20 Obtained License
1969-07-21 Finished Drilling
1969-07-21 Well Mode changed to Drilled and Cased
1969-07-22 Drill Stem Test Performed
1969-07-23 Drill Stem Test Performed
1969-07-23 Production Casing Operation Performed
1969-08-01 Perforation Treatment Performed - Jet Perforation
1969-08-03 Well Began Production
1969-08-03 Well Fluid changed to Crude Oil
1969-08-03 Well Mode changed to Flowing
1970-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-06-10 Perforation Treatment Performed - Cement Squeeze
1970-06-10 Perforation Treatment Performed - Jet Perforation
1970-06-10 Well Fluid changed to Crude Oil
1970-06-10 Well Mode changed to Abandoned Zone
1994-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-05 Plug Back Performed
1994-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-06 Perforation Treatment Performed - Jet Perforation
1994-06-06 Plug Back Performed
1994-06-09 Perforation Treatment Performed - Jet Perforation
2004-09-24 Perforation Treatment Performed - Fractured
2005-06-01 Perforation Treatment Performed - Jet Perforation
2005-06-01 Well Log Performed
2005-06-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-08-01 Perforation 910.10 911.40 10
1994-06-06 Perforation 551.50 552.50 13
1994-06-06 Perforation 561.50 562.50 13
1994-06-06 Perforation 565.60 566.60 13
1994-06-06 Perforation 575.60 576.60 13
1994-06-06 Packing Device Capped w/Cement 537.00 545.00 0
1994-06-09 Perforation 365.30 366.60 13
2004-09-24 Fracture 365.30 366.60 0
2005-06-01 Perforation 398.00 402.00 14
2005-06-16 Fracture 398.00 402.00 0
1970-06-10 Packing Device Capped w/Cement 899.80 899.80 0
1970-06-10 Perforation 706.50 706.80 13
1970-06-10 Cement Squeeze 706.50 706.80 0
1970-06-10 Perforation 687.30 687.60 13
1970-06-10 Perforation 686.10 687.60 10
1994-06-05 Packing Device Capped w/Cement 687.00 695.00 0
1994-06-06 Perforation 672.40 673.60 13
1994-06-06 Packing Device Capped w/Cement 658.00 666.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 146 0.0 0.0 0.0

For data sources see[5]

References