X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024073309004

Well Details

Well ID: 0024073309004
Loading map...
Location: 00/09-33-002-07W4/4
Location Alias: 00/09-33-02-07 W4M
Location Alias 2: 00/09-33-002-07 W4/04
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 33
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 9-33-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0411841
License Date: 2009-08-14
License Status: Issued
Spud Date: 2009-08-26
Final Drill Date: 2009-08-27
Well Total Depth: 918.40 m
Surface Hole Latitude: 49.168006
Surface Hole Longitude: -110.875785

For data sources see[1][2]

Well History

Date Event
2009-08-14 Obtained License
2009-08-26 Surface Casing Operation Performed
2009-08-27 Finished Drilling
2009-08-27 Well Log Performed
2009-08-27 Well Mode changed to Drilled and Cased
2009-08-28 Production Casing Operation Performed
2009-08-28 Rig Released
2009-09-12 Perforation Treatment Performed - Jet Perforation
2009-09-12 Well Log Performed
2009-09-25 Perforation Treatment Performed - Jet Perforation
2009-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-07 Perforation Treatment Performed - Jet Perforation
2009-10-07 Plug Back Performed
2009-10-08 Perforation Treatment Performed - Jet Perforation
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-08 Perforation Treatment Performed - Jet Perforation
2009-11-08 Plug Back Performed
2009-11-12 Perforation Treatment Performed - Jet Perforation
2009-11-20 Well Began Production
2009-11-20 Well Fluid changed to Gas
2009-11-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-12 Perforation 894.00 895.00 23
2009-11-08 Perforation 548.00 552.00 13
2009-11-08 Perforation 543.00 547.00 13
2009-11-12 Perforation 383.00 389.00 13
2009-11-12 Perforation 349.00 351.00 13
2009-09-25 Perforation 893.00 896.00 23
2009-10-07 Packing Device Capped w/Cement 882.00 890.00 0
2009-10-07 Perforation 745.00 746.50 23
2009-10-08 Perforation 683.50 685.00 23
2009-10-08 Perforation 670.00 673.00 23
2009-10-22 Perforation 657.00 658.00 23
2009-11-08 Packing Device Capped w/Cement 647.00 655.00 0
2009-11-08 Packing Device Capped w/Cement 647.00 655.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1008 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References