X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024072703000

Well Details

Well ID: 0024072703000
Loading map...
Location: 00/03-27-002-07W4/0
Location Alias: 00/03-27-02-07 W4M
Location Alias 2: 00/03-27-002-07 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 27
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 3-27-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0411937
License Date: 2009-08-21
License Status: Suspension
Spud Date: 2009-08-23
Final Drill Date: 2009-08-25
Well Total Depth: 991.00 m
Surface Hole Latitude: 49.144941
Surface Hole Longitude: -110.869106

For data sources see[1][2]

Well History

Date Event
2009-08-21 Obtained License
2009-08-24 Direction Drilling Operation Performed - Deviate
2009-08-24 Surface Casing Operation Performed
2009-08-25 Finished Drilling
2009-08-25 Production Casing Operation Performed
2009-08-25 Well Log Performed
2009-08-25 Well Mode changed to Drilled and Cased
2009-08-26 Rig Released
2009-09-15 Perforation Treatment Performed - Jet Perforation
2009-09-15 Well Log Performed
2009-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-25 Perforation Treatment Performed - Jet Perforation
2009-09-25 Plug Back Performed
2009-09-25 Well Mode changed to Abandoned Zone
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-11-02 Perforation Treatment Performed - Jet Perforation
2009-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-08 Perforation Treatment Performed - Jet Perforation
2009-11-08 Plug Back Performed
2009-11-12 Perforation Treatment Performed - Jet Perforation
2009-12-13 Well Log Performed
2010-01-06 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-24 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-15 Perforation 943.00 946.00 23
2009-11-12 Perforation 395.00 400.00 13
2009-11-12 Perforation 358.50 361.00 13
2010-01-06 Perforation 217.00 218.00 13
2010-01-06 Perforation 213.00 214.00 13
2010-01-06 Perforation 204.00 206.00 13
2009-09-25 Packing Device Capped w/Cement 932.00 940.00 0
2009-09-25 Perforation 718.50 720.00 23
2009-09-25 Perforation 704.00 707.00 23
2009-10-22 Perforation 692.00 693.00 23
2009-11-02 Perforation 687.50 688.50 13
2009-11-08 Packing Device Capped w/Cement 674.00 682.00 0
2009-11-08 Perforation 574.00 577.00 13
2009-11-08 Perforation 569.00 573.00 13

For data sources see[5]



References