X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024072611003

Well Details

Well ID: 0024072611003
Loading map...
Location: 00/11-26-002-07W4/3
Location Alias: 00/11-26-02-07 W4M
Location Alias 2: 00/11-26-002-07 W4/03
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 26
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF PENDOR 11-26-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0038363
License Date: 1970-07-03
License Status: Issued
Spud Date: 1970-07-07
Final Drill Date: 1970-07-11
Well Total Depth: 1036.90 m
Surface Hole Latitude: 49.155535
Surface Hole Longitude: -110.846068

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-07-03 Obtained License
1970-07-11 Finished Drilling
1970-07-11 Well Mode changed to Drilled and Cased
1970-07-12 Drill Stem Test Performed
1970-07-13 Drill Stem Test Performed
1970-07-14 Production Casing Operation Performed
1970-08-10 Perforation Treatment Performed - Jet Perforation
1970-09-21 Perforation Treatment Performed - Cement Squeeze
1970-09-21 Perforation Treatment Performed - Jet Perforation
1970-09-22 Perforation Treatment Performed - Jet Perforation
1970-09-25 Perforation Treatment Performed - Jet Perforation
2007-11-23 Perforation Treatment Performed - Jet Perforation
2007-11-23 Well Log Performed
2008-02-11 Perforation Treatment Performed - Jet Perforation
2008-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-15 Plug Back Performed
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-20 Well Fluid changed to Gas
2008-02-20 Well Mode changed to Testing
2008-03-12 Well Began Production
2008-03-12 Well Fluid changed to Gas
2008-03-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-08-10 Perforation 714.80 716.30 13
2008-02-19 Perforation 415.00 417.50 13
1970-09-21 Perforation 722.40 722.70 13
1970-09-21 Cement Squeeze 722.40 722.70 0
1970-09-22 Perforation 714.80 716.30 10
1970-09-25 Perforation 714.80 715.10 13
1970-09-25 Perforation 716.30 716.90 13
2007-11-23 Perforation 700.50 704.00 13
2008-02-11 Perforation 686.00 690.50 13
2008-02-15 Packing Device Capped w/Cement 672.00 680.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 7104 0.0 0.0 0.0
2009 8423 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References