X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024072213006

Well Details

Well ID: 0024072213006
Loading map...
Location: 00/13-22-002-07W4/6
Location Alias: 00/13-22-02-07 W4M
Location Alias 2: 00/13-22-002-07 W4/06
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 07
Section: 22
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF COMREY 13-22-2-7
Operator Name: Pine Cliff Energy Ltd.
License Number: 0393979
License Date: 2008-02-12
License Status: Amended
Spud Date: 2008-04-18
Final Drill Date: 2008-08-09
Well Total Depth: 965.00 m
Surface Hole Latitude: 49.143191
Surface Hole Longitude: -110.871404

For data sources see[1][2]

Well History

Date Event
2008-02-12 Obtained License
2008-04-18 Surface Casing Operation Performed
2008-08-09 Direction Drilling Operation Performed - Deviate
2008-08-09 Finished Drilling
2008-08-09 Well Log Performed
2008-08-09 Well Mode changed to Drilled and Cased
2008-08-10 Production Casing Operation Performed
2008-08-10 Rig Released
2008-08-21 Perforation Treatment Performed - Jet Perforation
2008-08-21 Well Log Performed
2008-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-09 Perforation Treatment Performed - Jet Perforation
2008-09-09 Plug Back Performed
2008-09-30 Perforation Treatment Performed - Jet Perforation
2008-10-05 Perforation Treatment Performed - Jet Perforation
2008-10-18 Perforation Treatment Performed - Jet Perforation
2008-10-22 Perforation Treatment Performed - Jet Perforation
2008-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-30 Perforation Treatment Performed - Jet Perforation
2008-10-30 Plug Back Performed
2008-11-04 Perforation Treatment Performed - Fractured
2009-01-27 Well Began Production
2009-01-27 Well Fluid changed to Gas
2009-01-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-08-09 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-08-21 Perforation 831.00 834.00 13
2008-11-04 Fracture 379.00 383.00 0
2008-09-09 Packing Device Capped w/Cement 820.00 828.00 0
2008-09-09 Perforation 705.00 707.00 13
2008-09-30 Perforation 687.00 689.00 13
2008-10-05 Perforation 674.00 676.50 13
2008-10-18 Perforation 662.50 665.00 13
2008-10-22 Perforation 658.00 660.00 13
2008-10-30 Packing Device Capped w/Cement 647.00 655.00 0
2008-10-30 Perforation 379.00 383.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 8063 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8445 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7247 0.0 0.0 0.0
2019 5520 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References