X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014281607000

Well Details

Well ID: 0014281607000
Loading map...
Location: 00/07-16-001-28W4/0
Location Alias: 00/07-16-01-28 W4M
Location Alias 2: 00/07-16-001-28 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 28
Section: 16
County/Municipality: Blood 148A
Well Name: LOYAL ENERGY LOOKOUT 7-16-1-28
Operator Name: Loyal Energy (canada) Operating Ltd.
License Number: 0036501
License Date: 1969-07-08
License Status: Issued
Spud Date: 1969-07-14
Final Drill Date: 1969-10-14
Well Total Depth: 3560.10 m
Surface Hole Latitude: 49.033147
Surface Hole Longitude: -113.689182

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-07-08 Obtained License
1969-07-18 Lost Circulation Occurred
1969-10-03 Production Casing Operation Performed
1969-10-08 Perforation Treatment Performed - Jet Perforation
1969-10-14 Finished Drilling
1969-10-14 Perforation Treatment Performed - Open-Hole Completion
1969-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-22 Perforation Treatment Performed - Alcohol Squeeze
1970-11-27 Well Mode changed to Drilled and Cased
1971-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-05-05 Well Began Production
1971-05-05 Well Fluid changed to Gas
1971-05-05 Well Mode changed to Flowing
1990-03-08 Well Fluid changed to Gas
1990-03-08 Well Mode changed to Suspended
1992-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-07 Well Fluid changed to Gas
1992-02-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-10-08 Perforation 3429.00 3429.60 13
1969-10-08 Perforation 3267.50 3268.10 13
1969-10-14 Open Hole/Barefoot Completion 3447.30 3560.10 0
1969-10-21 Acid Treatment 3447.30 3560.10 0
1969-10-23 Acid Treatment 3429.00 3560.10 0
1969-11-22 Alchohol Squeeze 3447.30 3560.10 0
1971-03-24 Acid Treatment 3447.30 3560.10 0
1992-02-07 Acid Treatment 3429.00 3560.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 4685 0.0 0.0 0.0
1972 8199 0.0 0.0 0.0
1973 8398 0.0 0.0 0.0
1974 8303 0.0 0.0 0.0
1975 8267 0.0 0.0 0.0
1976 8469 0.0 0.0 0.0
1977 7484 0.0 0.0 0.0
1978 6515 0.0 0.0 0.0
1979 7757 0.0 0.0 0.0
1980 6704 0.0 0.0 0.0
1981 7937 0.0 0.0 0.0
1982 6177 0.0 0.0 0.0
1983 7909 0.0 0.0 0.0
1984 8366 0.0 0.0 0.0
1985 8433 0.0 0.0 0.0
1986 8684 0.0 0.0 0.0
1987 8711 0.0 0.0 0.0
1988 6358 0.0 0.0 0.0
1989 5053 0.0 0.0 0.0
1992 6582 0.0 0.0 0.0
1993 8737 0.0 0.0 0.0
1994 8624 0.0 0.0 0.0
1995 8285 0.0 0.0 0.0
1996 8465 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 7690 0.0 0.0 0.0
1999 8663 0.0 0.0 0.0
2000 8483 0.0 0.0 0.0
2001 8713 0.0 0.0 0.0
2002 8499 0.0 0.0 0.0
2003 8343 0.0 0.0 0.0
2004 8195 0.0 0.0 0.0
2005 8420 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 5400 0.0 0.0 0.0
2009 1383 0.0 0.0 0.0
2010 8594 0.0 0.0 0.0
2011 8215 0.0 0.0 0.0
2012 4630 0.0 0.0 0.0
2013 8250 0.0 0.0 0.0
2014 7973 0.0 0.0 0.0
2015 8022 0.0 0.0 0.0
2016 8668 0.0 0.0 0.0
2017 7399 0.0 0.0 0.0
2018 8421 0.0 0.0 0.0
2019 7738 0.0 0.0 0.0
2020 2152 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1969-07-18 Lost Circulation 198.40 198.40

For data sources see[6]

References