X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014171016002

Well Details

Well ID: 0014171016002
Loading map...
Location: 00/16-10-001-17W4/2
Location Alias: 00/16-10-01-17 W4M
Location Alias 2: 00/16-10-001-17 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 17
Section: 10
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 16-10-1-17
Operator Name: Crescent Point Energy Corp.
License Number: 0169753
License Date: 1994-08-22
License Status: Issued
Spud Date: 1995-08-17
Final Drill Date: 1995-08-21
Well Total Depth: 965.00 m
Surface Hole Latitude: 49.025853
Surface Hole Longitude: -112.193588

For data sources see[1][2]

Well History

Date Event
1994-08-22 Obtained License
1995-08-18 Surface Casing Operation Performed
1995-08-19 Direction Drilling Operation Performed - Deviate
1995-08-21 Finished Drilling
1995-08-21 Well Log Performed
1995-08-21 Well Mode changed to Drilled and Cased
1995-08-22 Production Casing Operation Performed
1995-08-22 Rig Released
1995-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-25 Perforation Treatment Performed - Jet Perforation
1995-08-25 Plug Back Performed
1995-08-26 Perforation Treatment Performed - Jet Perforation
1995-09-15 Well Log Performed
2007-01-10 Perforation Treatment Performed - Cement Squeeze
2007-01-10 Plug Back Performed
2007-01-20 Perforation Treatment Performed - Jet Perforation
2007-01-22 Perforation Treatment Performed - Jet Perforation
2007-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-20 Well Began Injection
2007-09-20 Well Fluid changed to Water
2007-09-20 Well Type changed to Disposal
2007-10-04 Perforation Treatment Performed - Jet Perforation
2007-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-19 358.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-25 Perforation 918.00 923.00 13
2007-10-04 Perforation 923.00 927.00 17
2007-10-04 Perforation 935.00 944.10 17
2007-10-05 Acid Treatment 923.00 927.00 0
2007-10-05 Acid Treatment 935.00 944.10 0
1995-08-25 Packing Device Capped w/Cement 905.00 913.00 0
1995-08-25 Perforation 872.00 875.00 13
1995-08-26 Perforation 865.00 869.00 13
2007-01-10 Cement Squeeze 865.00 869.00 0
2007-01-10 Cement Squeeze 872.00 875.00 0
2007-01-20 Perforation 872.00 875.00 13
2007-01-22 Perforation 915.00 923.00 17
2007-01-23 Acid Treatment 915.00 923.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[6]

References