X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014170908002

Well Details

Well ID: 0014170908002
Loading map...
Location: 00/08-09-001-17W4/2
Location Alias: 00/08-09-01-17 W4M
Location Alias 2: 00/08-09-001-17 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 17
Section: 09
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 8-9-1-17
Operator Name: Crescent Point Energy Corp.
License Number: 0172322
License Date: 1994-11-09
License Status: Suspension
Spud Date: 1995-08-23
Final Drill Date: 1995-08-27
Well Total Depth: 1026.00 m
Surface Hole Latitude: 49.019133
Surface Hole Longitude: -112.210718

For data sources see[1][2]

Well History

Date Event
1994-11-09 Obtained License
1995-08-24 Direction Drilling Operation Performed - Deviate
1995-08-24 Surface Casing Operation Performed
1995-08-27 Finished Drilling
1995-08-27 Well Log Performed
1995-08-27 Well Mode changed to Drilled and Cased
1995-08-28 Production Casing Operation Performed
1995-08-28 Rig Released
1995-08-31 Perforation Treatment Performed - Jet Perforation
1995-10-03 Well Log Performed
2002-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-17 Perforation Treatment Performed - Jet Perforation
2002-05-17 Plug Back Performed
2002-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-05 Plug Back Performed
2002-11-05 Well Mode changed to Abandoned Zone
2002-11-07 Well Abandoned
2002-11-07 Well Mode changed to Abandoned and Re-entered

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-24 197.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-31 Perforation 928.00 930.00 13
1995-08-31 Perforation 931.00 933.00 13
2002-05-17 Packing Device Capped w/Cement 910.00 918.00 0
2002-05-17 Perforation 889.00 891.00 13
2002-05-20 Acid Treatment 889.00 891.00 0
2002-11-05 Packing Device Capped w/Cement 875.00 883.00 0

For data sources see[5]



References