X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014170409000

Well Details

Well ID: 0014170409000
Loading map...
Location: 00/09-04-001-17W4/0
Location Alias: 00/09-04-01-17 W4M
Location Alias 2: 00/09-04-001-17 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 17
Section: 04
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 9-4-1-17
Operator Name: Crescent Point Energy Corp.
License Number: 0031452
License Date: 1966-12-14
License Status: Suspension
Spud Date: 1966-12-16
Final Drill Date: 1966-12-23
Well Total Depth: 881.50 m
Surface Hole Latitude: 49.008180
Surface Hole Longitude: -112.212862

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-14 Obtained License
1966-12-21 Drill Stem Test Performed
1966-12-23 Drill Stem Test Performed
1966-12-23 Finished Drilling
1966-12-23 Well Mode changed to Drilled and Cased
1966-12-24 Drill Stem Test Performed
1966-12-26 Drill Stem Test Performed
1966-12-26 Production Casing Operation Performed
1967-01-19 Perforation Treatment Performed - Bullet Perforation
1967-01-26 Perforation Treatment Performed - Bullet Perforation
1967-01-27 Perforation Treatment Performed - Cement Squeeze
1967-01-30 Perforation Treatment Performed - Bullet Perforation
1967-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-12-10 Well Began Production
1967-12-10 Well Fluid changed to Crude Oil
1967-12-10 Well Mode changed to Pumping
1968-12-01 Well Fluid changed to Crude Oil
1968-12-01 Well Mode changed to Suspended
1994-05-25 Well Fluid changed to Crude Oil
1994-05-25 Well Mode changed to Closed
1998-11-20 Well Fluid changed to Crude Oil
1998-11-20 Well Mode changed to Suspended
2006-02-01 Well Fluid changed to Crude Oil
2006-02-01 Well Mode changed to Pumping
2006-02-14 Perforation Treatment Performed - Jet Perforation
2006-03-28 Perforation Treatment Performed - Chemical Squeeze
2006-09-27 Perforation Treatment Performed - Jet Perforation
2006-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-19 Bullet Perforation 878.10 879.30 13
1967-01-26 Bullet Perforation 850.40 851.00 13
1967-01-27 Cement Squeeze 850.40 851.00 0
1967-01-30 Bullet Perforation 840.00 842.50 13
1967-02-02 Acid Treatment 840.00 842.50 0
2006-02-14 Perforation 878.10 879.30 13
2006-03-28 Chemical Squeeze 840.00 842.50 0
2006-09-27 Perforation 877.00 881.00 17
2006-09-28 Acid Treatment 877.00 881.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 696 0.0 0.0 0.0
1968 3850 0.0 0.0 0.0
2006 5215 0.0 0.0 0.0
2007 2520 0.0 0.0 0.0
2008 120 0.0 0.0 0.0

For data sources see[5]

References