X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014170313F10

Well Details

Well ID: 0014170313F10
Loading map...
Location: F1/13-03-001-17W4/0
Location Alias: F1/13-03-01-17 W4M
Location Alias 2: F1/13-03-001-17 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 17
Section: 03
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 13-3-1-17
Operator Name: Crescent Point Energy Corp.
License Number: 0054276
License Date: 1975-07-21
License Status: RecCertified
Spud Date: 1975-07-21
Final Drill Date: 1975-07-28
Well Total Depth: 912.50 m
Surface Hole Latitude: 49.011820
Surface Hole Longitude: -112.207035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-07-21 Obtained License
1975-07-28 Finished Drilling
1975-07-29 Drill Stem Test Performed
1975-07-30 Perforation Treatment Performed - Jet Perforation
1975-07-30 Production Casing Operation Performed
1975-09-14 Perforation Treatment Performed - Fractured
1976-03-02 Well Mode changed to Drilled and Cased
1988-04-05 Well Began Production
1988-04-05 Well Fluid changed to Crude Oil
1988-04-05 Well Mode changed to Pumping
1988-10-01 Perforation Treatment Performed - Jet Perforation
1989-08-04 Perforation Treatment Performed - Jet Perforation
1989-10-01 Perforation Treatment Performed - Jet Perforation
1993-12-12 Perforation Treatment Performed - Jet Perforation
1993-12-13 Perforation Treatment Performed - Fractured
1993-12-16 Perforation Treatment Performed - Jet Perforation
1994-05-25 Well Fluid changed to Crude Oil
1994-05-25 Well Mode changed to Closed
1998-11-20 Well Fluid changed to Crude Oil
1998-11-20 Well Mode changed to Suspended
1998-11-23 Well Fluid changed to Crude Oil
1998-11-23 Well Mode changed to Suspended
1999-09-26 Perforation Treatment Performed - Chemical Squeeze
1999-09-29 Perforation Treatment Performed - Open-Hole Completion
1999-10-04 Well Fluid changed to Crude Oil
1999-10-04 Well Mode changed to Suspended
2013-11-06 Well Log Performed
2013-11-08 Perforation Treatment Performed - Cement Plug
2013-11-08 Plug Back Performed
2013-11-08 Well Fluid changed to Crude Oil
2013-11-08 Well Mode changed to Abandoned Zone
2014-01-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-30 Perforation 843.10 844.90 0
1999-09-29 Open Hole/Barefoot Completion 870.00 912.50 0
2013-11-08 Cement Plug 800.20 905.00 0
1975-09-14 Fracture 843.10 844.90 0
1988-10-01 Perforation 842.80 844.80 13
1989-08-04 Perforation 842.80 844.80 12
1989-10-01 Perforation 842.80 844.80 12
1993-12-12 Perforation 842.80 844.80 13
1993-12-13 Fracture 842.80 844.80 0
1993-12-16 Perforation 850.40 853.40 13
1999-09-26 Chemical Squeeze 842.80 853.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1060 0.0 0.0 0.0
1989 1926 0.0 0.0 0.0
1990 1844 0.0 0.0 0.0
1991 1308 0.0 0.0 0.0
1992 1848 0.0 0.0 0.0
1993 312 0.0 0.0 0.0
1994 64 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References