X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160610000

Well Details

Well ID: 0014160610000
Loading map...
Location: 00/10-06-001-16W4/0
Location Alias: 00/10-06-01-16 W4M
Location Alias 2: 00/10-06-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 06
County/Municipality: County of Warner No. 5
Well Name: MURPHY RED COULEE IN 10-6-1-16
Operator Name: Spitzee Resources Ltd.
License Number: 0003740
License Date: 1951-11-08
License Status: RecCertified
Spud Date: 1951-11-21
Final Drill Date: 1951-12-23
Well Total Depth: 842.50 m
Surface Hole Latitude: 49.008096
Surface Hole Longitude: -112.129749

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-08 Obtained License
1951-12-13 Drill Stem Test Performed
1951-12-17 Drill Stem Test Performed
1951-12-20 Drill Stem Test Performed
1951-12-23 Finished Drilling
1951-12-23 Well Mode changed to Drilled and Cased
1951-12-27 Drill Stem Test Performed
1951-12-27 Production Casing Operation Performed
1951-12-30 Perforation Treatment Performed - Bullet Perforation
1952-01-07 Perforation Treatment Performed - Acid Wash - No Pressure
1952-07-25 Perforation Treatment Performed - Cement Squeeze
1952-07-29 Perforation Treatment Performed - Jet Perforation
1952-07-31 Perforation Treatment Performed - Acid Wash - No Pressure
1952-08-04 Perforation Treatment Performed - Cement Plug
1952-09-01 Well Began Production
1952-09-01 Well Fluid changed to Crude Oil
1952-09-01 Well Mode changed to Pumping
1968-10-25 Well Began Injection
1968-10-25 Well Fluid changed to Water
1968-10-25 Well Type changed to Injection
1968-12-01 Perforation Treatment Performed - Acid Wash - No Pressure
1983-07-01 Well Fluid changed to Water
1983-07-01 Well Mode changed to Suspended
1983-07-01 Well Type changed to Injection
1987-05-14 Well Fluid changed to Water
1987-05-14 Well Mode changed to Suspended
1987-05-14 Well Type changed to Injection
1988-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-29 Perforation Treatment Performed - Jet Perforation
1988-05-29 Plug Back Performed
1988-05-29 Well Fluid changed to Water
1988-05-29 Well Mode changed to Abandoned
1988-05-29 Well Type changed to Injection
1988-05-31 Perforation Treatment Performed - Cement Squeeze
1988-05-31 Plug Back Performed
1988-06-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-30 Bullet Perforation 794.30 798.60 13
1988-05-31 Cement Squeeze 300.00 300.50 0
1952-01-07 Acid Wash 794.30 798.60 0
1952-07-25 Cement Squeeze 794.30 798.60 0
1952-07-29 Perforation 794.00 797.10 13
1952-07-31 Acid Wash 794.00 797.10 0
1952-08-04 Cement Plug 797.70 842.50 0
1968-12-01 Acid Wash 794.00 797.10 0
1988-05-29 Packing Device Capped w/Cement 758.00 766.00 0
1988-05-29 Perforation 300.00 300.50 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5520 0.0 0.0 0.0
1968 4223 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1987 317 0.0 0.0 0.0

For data sources see[5]

References