X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160606000

Well Details

Well ID: 0014160606000
Loading map...
Location: 00/06-06-001-16W4/0
Location Alias: 00/06-06-01-16 W4M
Location Alias 2: 00/06-06-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 06
County/Municipality: County of Warner No. 5
Well Name: MURPHY MILK RIVER 6-6-1-16
Operator Name: Spitzee Resources Ltd.
License Number: 0006748
License Date: 1953-07-15
License Status: RecCertified
Spud Date: 1953-07-14
Final Drill Date: 1953-07-26
Well Total Depth: 823.00 m
Surface Hole Latitude: 49.005322
Surface Hole Longitude: -112.133555

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-01 Production Casing Operation Performed
1953-07-15 Obtained License
1953-07-26 Finished Drilling
1953-07-26 Well Mode changed to Drilled and Cased
1953-08-01 Perforation Treatment Performed - Bullet Perforation
1953-08-19 Perforation Treatment Performed - Fractured
1953-08-22 Well Began Production
1953-08-22 Well Fluid changed to Crude Oil
1953-08-22 Well Mode changed to Pumping
1984-07-31 Well Fluid changed to Crude Oil
1984-07-31 Well Mode changed to Suspended
1988-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-24 Well Fluid changed to Crude Oil
1988-05-24 Well Mode changed to Abandoned
1988-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-25 Perforation Treatment Performed - Jet Perforation
1988-05-26 Perforation Treatment Performed - Cement Squeeze
1988-06-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-01 Bullet Perforation 812.30 816.90 20
1953-08-01 Bullet Perforation 812.60 814.10 7
1953-08-19 Fracture 812.30 816.90 0
1988-05-24 Packing Device Capped w/Cement 759.50 767.50 0
1988-05-25 Perforation 526.00 526.80 13
1988-05-25 Packing Device Capped w/Cement 489.00 497.00 0
1988-05-25 Perforation 305.00 305.80 13
1988-05-26 Cement Squeeze 305.00 305.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5448 0.0 0.0 0.0
1968 8687 0.0 0.0 0.0
1969 8136 0.0 0.0 0.0
1970 8328 0.0 0.0 0.0
1971 8645 0.0 0.0 0.0
1972 8701 0.0 0.0 0.0
1973 8651 0.0 0.0 0.0
1974 8688 0.0 0.0 0.0
1975 8626 0.0 0.0 0.0
1976 7255 0.0 0.0 0.0
1978 456 0.0 0.0 0.0
1982 380 0.0 0.0 0.0

For data sources see[5]

References