X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160603020

Well Details

Well ID: 0014160603020
Loading map...
Location: 02/03-06-001-16W4/0
Location Alias: 02/03-06-01-16 W4M
Location Alias 2: 02/03-06-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 06
County/Municipality: County of Warner No. 5
Well Name: CPEC COUTTS 3-6-1-16
Operator Name: Crescent Point Energy Corp.
License Number: 0199113
License Date: 1997-03-10
License Status: Suspension
Spud Date: 1997-03-17
Final Drill Date: 1997-03-21
Well Total Depth: 827.50 m
Surface Hole Latitude: 49.000519
Surface Hole Longitude: -112.133107

For data sources see[1][2]

Well History

Date Event
1997-03-10 Obtained License
1997-03-18 Direction Drilling Operation Performed - Deviate
1997-03-18 Surface Casing Operation Performed
1997-03-20 Drill Stem Test Performed
1997-03-21 Finished Drilling
1997-03-21 Well Log Performed
1997-03-21 Well Mode changed to Drilled and Cased
1997-03-22 Production Casing Operation Performed
1997-03-22 Rig Released
1997-03-24 Well Log Performed
1997-04-23 Perforation Treatment Performed - Open-Hole Completion
1997-04-23 Well Log Performed
1997-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-25 Perforation Treatment Performed - Jet Perforation
1997-04-25 Plug Back Performed
1997-05-03 Perforation Treatment Performed - Fractured
1997-05-10 Well Began Production
1997-05-10 Well Fluid changed to Crude Oil
1997-05-10 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-18 195.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-23 Open Hole/Barefoot Completion 816.00 827.50 0
1997-04-25 Packing Device Capped w/Cement 800.00 808.00 0
1997-04-25 Perforation 785.00 786.50 13
1997-04-25 Perforation 792.00 795.50 13
1997-05-03 Fracture 785.00 795.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5283 0.0 0.0 0.0
1998 7164 0.0 0.0 0.0
1999 6035 0.0 0.0 0.0
2000 5243 0.0 0.0 0.0
2001 6059 0.0 0.0 0.0
2002 5448 0.0 0.0 0.0
2003 2752 0.0 0.0 0.0
2004 2442 0.0 0.0 0.0
2005 6847 0.0 0.0 0.0
2006 7205 0.0 0.0 0.0
2007 6475 0.0 0.0 0.0
2008 5952 0.0 0.0 0.0
2009 6864 0.0 0.0 0.0
2010 8283 0.0 0.0 0.0
2011 7732 0.0 0.0 0.0
2012 7679 0.0 0.0 0.0
2013 7416 0.0 0.0 0.0
2014 5320 0.0 0.0 0.0

For data sources see[6]

References