X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014160503D00

Well Details

Well ID: 0014160503D00
Loading map...
Location: D0/03-05-001-16W4/0
Location Alias: D0/03-05-01-16 W4M
Location Alias 2: D0/03-05-001-16 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 16
Section: 05
County/Municipality: County of Warner No. 5
Well Name: MURPHY RED COULEE 3D-5-1-16
Operator Name: Murphy Oil Company Ltd.
License Number: 0028913
License Date: 1965-09-03
License Status: RecCertified
Spud Date: 1965-09-04
Final Drill Date: 1965-09-12
Well Total Depth: 820.50 m
Surface Hole Latitude: 49.001800
Surface Hole Longitude: -112.111219

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-09-03 Obtained License
1965-09-12 Finished Drilling
1965-09-12 Well Mode changed to Drilled and Cased
1965-09-13 Production Casing Operation Performed
1965-09-14 Perforation Treatment Performed - Jet Perforation
1965-10-22 Well Began Production
1965-10-22 Well Fluid changed to Crude Oil
1965-10-22 Well Mode changed to Pumping
1965-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-14 Perforation Treatment Performed - Fractured
1978-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-10 Well Log Performed
1978-08-29 Perforation Treatment Performed - Jet Perforation
1978-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-30 Perforation Treatment Performed - Jet Perforation
1978-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-01 Well Abandoned
1978-09-01 Well Fluid changed to Crude Oil
1978-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-09-14 Perforation 765.40 769.00 13
1978-09-01 Packing Device Capped w/Cement 467.90 467.90 0
1965-11-14 Acid Treatment 765.40 769.00 0
1965-11-14 Fracture 765.40 769.00 0
1978-07-05 Packing Device Capped w/Cement 752.90 752.90 0
1978-08-29 Perforation 611.70 613.00 13
1978-08-29 Perforation 606.90 608.40 13
1978-08-30 Packing Device Capped w/Cement 600.50 600.50 0
1978-08-30 Perforation 475.20 477.90 13
1978-08-31 Acid Treatment 475.20 477.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7975 0.0 0.0 0.0
1968 8612 0.0 0.0 0.0
1969 6888 0.0 0.0 0.0
1970 8520 0.0 0.0 0.0
1971 8729 0.0 0.0 0.0
1972 8728 0.0 0.0 0.0
1973 8751 0.0 0.0 0.0
1974 8711 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 8483 0.0 0.0 0.0
1977 7464 0.0 0.0 0.0

For data sources see[5]

References