If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014112916004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.070095,"lon":-111.433613,"icon":""}]} |
Location: 00/16-29-001-11W4/4 | |
Location Alias: 00/16-29-01-11 W4M | |
Location Alias 2: 00/16-29-001-11 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 11 | |
Section: 29 | |
County/Municipality: County of Warner No. 5 | |
Well Name: THORRESOURCES KNAPPEN 16-29-1-11 | |
Operator Name: Thor Resources Inc. | |
License Number: 0019461 | |
License Date: 1960-07-29 | |
License Status: Issued | |
Spud Date: 1960-08-06 | |
Final Drill Date: 1960-10-20 | |
Well Total Depth: 1818.70 m | |
Surface Hole Latitude: 49.070095 | |
Surface Hole Longitude: -111.433613 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-07-29 | Obtained License |
1960-08-13 | Drill Stem Test Performed |
1960-08-14 | Drill Stem Test Performed |
1960-08-15 | Drill Stem Test Performed |
1960-08-16 | Drill Stem Test Performed |
1960-08-17 | Drill Stem Test Performed |
1960-08-18 | Drill Stem Test Performed |
1960-09-03 | Drill Stem Test Performed |
1960-09-07 | Drill Stem Test Performed |
1960-09-11 | Drill Stem Test Performed |
1960-09-13 | Drill Stem Test Performed |
1960-09-14 | Drill Stem Test Performed |
1960-09-17 | Drill Stem Test Performed |
1960-09-18 | Drill Stem Test Performed |
1960-09-22 | Drill Stem Test Performed |
1960-09-25 | Drill Stem Test Performed |
1960-09-26 | Drill Stem Test Performed |
1960-10-15 | Drill Stem Test Performed |
1960-10-16 | Drill Stem Test Performed |
1960-10-20 | Finished Drilling |
1960-10-20 | Well Mode changed to Drilled and Cased |
1960-10-21 | Drill Stem Test Performed |
1960-10-23 | Production Casing Operation Performed |
1974-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-01-17 | Perforation Treatment Performed - Jet Perforation |
1974-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-11-23 | Perforation Treatment Performed - Cement Squeeze |
1978-11-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-11-29 | Perforation Treatment Performed - Jet Perforation |
1980-09-18 | Perforation Treatment Performed - Cement Squeeze |
1980-09-19 | Perforation Treatment Performed - Cement Squeeze |
1980-10-07 | Perforation Treatment Performed - Jet Perforation |
1980-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-17 | Perforation Treatment Performed - Jet Perforation |
1980-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-26 | Perforation Treatment Performed - Jet Perforation |
1980-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-07 | Perforation Treatment Performed - Jet Perforation |
1980-11-19 | Well Began Production |
1980-11-19 | Well Fluid changed to Gas |
1980-11-19 | Well Mode changed to Flowing |
1981-03-28 | Well Fluid changed to Gas |
1981-03-28 | Well Mode changed to Suspended |
1985-03-14 | Well Fluid changed to Gas |
1985-03-14 | Well Mode changed to Flowing |
1996-06-30 | Well Fluid changed to Gas |
1996-06-30 | Well Mode changed to Suspended |
1999-02-12 | Perforation Treatment Performed - Jet Perforation |
1999-04-17 | Well Fluid changed to Gas |
1999-04-17 | Well Mode changed to Flowing |
2003-06-01 | Well Fluid changed to Gas |
2003-06-01 | Well Mode changed to Suspended |
2003-12-20 | Well Fluid changed to Gas |
2003-12-20 | Well Mode changed to Flowing |
2012-09-01 | Well Fluid changed to Gas |
2012-09-01 | Well Mode changed to Suspended |
2014-10-01 | Kick Occurred |
2014-10-04 | Kick Occurred |
2014-10-12 | Well Log Performed |
2014-10-15 | Well Log Performed |
2014-10-16 | Perforation Treatment Performed - Jet Perforation |
2015-02-19 | Perforation Treatment Performed - Cement Squeeze |
2015-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-02-23 | Perforation Treatment Performed - Cement Squeeze |
2015-03-03 | Perforation Treatment Performed - Jet Perforation |
2015-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-01-16 | Packing Device Capped w/Cement | 868.70 | 876.30 | 0 |
1980-09-19 | Cement Squeeze | 759.90 | 764.70 | 0 |
1980-10-07 | Perforation | 1485.00 | 1487.50 | 13 |
1980-10-09 | Acid Treatment | 1485.00 | 1487.50 | 0 |
1980-10-17 | Perforation | 1462.00 | 1465.00 | 13 |
1980-10-18 | Acid Treatment | 1462.00 | 1465.00 | 0 |
1980-10-26 | Perforation | 1442.00 | 1447.00 | 13 |
1980-10-28 | Acid Treatment | 1442.00 | 1447.00 | 0 |
1980-11-07 | Perforation | 799.00 | 804.00 | 13 |
1999-02-12 | Perforation | 799.20 | 803.80 | 13 |
2014-10-16 | Perforation | 1795.00 | 1813.50 | 17 |
1974-01-17 | Perforation | 827.80 | 832.70 | 7 |
2015-02-19 | Cement Squeeze | 1442.00 | 1447.00 | 0 |
2015-02-22 | Acid Treatment | 799.00 | 804.00 | 0 |
2015-02-23 | Cement Squeeze | 799.00 | 804.00 | 0 |
2015-03-03 | Perforation | 1475.00 | 1481.00 | 17 |
2015-03-03 | Perforation | 1466.50 | 1472.50 | 17 |
2015-03-06 | Acid Treatment | 1475.00 | 1481.00 | 0 |
2015-03-06 | Acid Treatment | 1466.50 | 1472.50 | 0 |
1974-01-17 | Perforation | 759.90 | 764.70 | 7 |
1974-01-20 | Acid Treatment | 827.80 | 832.70 | 0 |
1978-11-21 | Acid Treatment | 832.30 | 832.70 | 0 |
1978-11-23 | Cement Squeeze | 827.80 | 832.70 | 0 |
1978-11-29 | Perforation | 823.80 | 826.20 | 7 |
1978-11-29 | Acid Treatment | 823.80 | 826.20 | 0 |
1980-09-18 | Cement Squeeze | 823.80 | 826.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 910 | 0.0 | 0.0 | 0.0 |
1981 | 1320 | 0.0 | 0.0 | 0.0 |
1985 | 2818 | 0.0 | 0.0 | 0.0 |
1986 | 2029 | 0.0 | 0.0 | 0.0 |
1987 | 3682 | 0.0 | 0.0 | 0.0 |
1988 | 1251 | 0.0 | 0.0 | 0.0 |
1989 | 1346 | 0.0 | 0.0 | 0.0 |
1990 | 3615 | 0.0 | 0.0 | 0.0 |
1991 | 3652 | 0.0 | 0.0 | 0.0 |
1992 | 1851 | 0.0 | 0.0 | 0.0 |
1993 | 4175 | 0.0 | 0.0 | 0.0 |
1994 | 8026 | 0.0 | 0.0 | 0.0 |
1995 | 8604 | 0.0 | 0.0 | 0.0 |
1996 | 4032 | 0.0 | 0.0 | 0.0 |
1999 | 5996 | 0.0 | 0.0 | 0.0 |
2000 | 8512 | 0.0 | 0.0 | 0.0 |
2001 | 8689 | 0.0 | 0.0 | 0.0 |
2002 | 7147 | 0.0 | 0.0 | 0.0 |
2003 | 180 | 0.0 | 0.0 | 0.0 |
2004 | 8431 | 0.0 | 0.0 | 0.0 |
2005 | 2500 | 0.0 | 0.0 | 0.0 |
2006 | 7685 | 0.0 | 0.0 | 0.0 |
2007 | 1390 | 0.0 | 0.0 | 0.0 |
2008 | 7727 | 0.0 | 0.0 | 0.0 |
2009 | 8699 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8543 | 0.0 | 0.0 | 0.0 |
2012 | 4991 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-01 | Kick | 650.00 | 650.00 |
2014-10-04 | Kick | 20.00 | 20.00 |
2015-02-23 | No Incident Encountered | 0.00 | 0.00 |
2015-03-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]