X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014112916000

Well Details

Well ID: 0014112916000
Loading map...
Location: 00/16-29-001-11W4/0
Location Alias: 00/16-29-01-11 W4M
Location Alias 2: 00/16-29-001-11 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 11
Section: 29
County/Municipality: County of Warner No. 5
Well Name: THORRESOURCES KNAPPEN 16-29-1-11
Operator Name: Thor Resources Inc.
License Number: 0019461
License Date: 1960-07-29
License Status: Issued
Spud Date: 1960-08-06
Final Drill Date: 1960-10-20
Well Total Depth: 1818.70 m
Surface Hole Latitude: 49.070095
Surface Hole Longitude: -111.433613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-29 Obtained License
1960-08-13 Drill Stem Test Performed
1960-08-14 Drill Stem Test Performed
1960-08-15 Drill Stem Test Performed
1960-08-16 Drill Stem Test Performed
1960-08-17 Drill Stem Test Performed
1960-08-18 Drill Stem Test Performed
1960-09-03 Drill Stem Test Performed
1960-09-07 Drill Stem Test Performed
1960-09-11 Drill Stem Test Performed
1960-09-13 Drill Stem Test Performed
1960-09-14 Drill Stem Test Performed
1960-09-17 Drill Stem Test Performed
1960-09-18 Drill Stem Test Performed
1960-09-22 Drill Stem Test Performed
1960-09-25 Drill Stem Test Performed
1960-09-26 Drill Stem Test Performed
1960-10-15 Drill Stem Test Performed
1960-10-16 Drill Stem Test Performed
1960-10-20 Finished Drilling
1960-10-21 Drill Stem Test Performed
1960-10-23 Production Casing Operation Performed
1961-01-10 Well Mode changed to Drilled and Cased
1974-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-01-17 Perforation Treatment Performed - Jet Perforation
1974-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-22 Well Began Production
1977-06-22 Well Fluid changed to Gas
1977-06-22 Well Mode changed to Flowing
1978-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-23 Perforation Treatment Performed - Cement Squeeze
1978-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-29 Perforation Treatment Performed - Jet Perforation
1979-05-31 Well Fluid changed to Gas
1979-05-31 Well Mode changed to Suspended
1980-09-18 Perforation Treatment Performed - Cement Squeeze
1980-09-19 Perforation Treatment Performed - Cement Squeeze
1980-10-07 Perforation Treatment Performed - Jet Perforation
1980-10-07 Well Fluid changed to Gas
1980-10-07 Well Mode changed to Abandoned Zone
1980-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-17 Perforation Treatment Performed - Jet Perforation
1980-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-26 Perforation Treatment Performed - Jet Perforation
1980-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-07 Perforation Treatment Performed - Jet Perforation
1999-02-12 Perforation Treatment Performed - Jet Perforation
2014-10-01 Kick Occurred
2014-10-04 Kick Occurred
2014-10-12 Well Log Performed
2014-10-15 Well Log Performed
2014-10-16 Perforation Treatment Performed - Jet Perforation
2015-02-19 Perforation Treatment Performed - Cement Squeeze
2015-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-23 Perforation Treatment Performed - Cement Squeeze
2015-03-03 Perforation Treatment Performed - Jet Perforation
2015-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-16 Packing Device Capped w/Cement 868.70 876.30 0
1980-09-19 Cement Squeeze 759.90 764.70 0
1980-10-07 Perforation 1485.00 1487.50 13
1980-10-09 Acid Treatment 1485.00 1487.50 0
1980-10-17 Perforation 1462.00 1465.00 13
1980-10-18 Acid Treatment 1462.00 1465.00 0
1980-10-26 Perforation 1442.00 1447.00 13
1980-10-28 Acid Treatment 1442.00 1447.00 0
1980-11-07 Perforation 799.00 804.00 13
1999-02-12 Perforation 799.20 803.80 13
2014-10-16 Perforation 1795.00 1813.50 17
1974-01-17 Perforation 827.80 832.70 7
2015-02-19 Cement Squeeze 1442.00 1447.00 0
2015-02-22 Acid Treatment 799.00 804.00 0
2015-02-23 Cement Squeeze 799.00 804.00 0
2015-03-03 Perforation 1475.00 1481.00 17
2015-03-03 Perforation 1466.50 1472.50 17
2015-03-06 Acid Treatment 1475.00 1481.00 0
2015-03-06 Acid Treatment 1466.50 1472.50 0
1974-01-17 Perforation 759.90 764.70 7
1974-01-20 Acid Treatment 827.80 832.70 0
1978-11-21 Acid Treatment 832.30 832.70 0
1978-11-23 Cement Squeeze 827.80 832.70 0
1978-11-29 Perforation 823.80 826.20 7
1978-11-29 Acid Treatment 823.80 826.20 0
1980-09-18 Cement Squeeze 823.80 826.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 35 0.0 0.0 0.0
1977 3024 0.0 0.0 0.0
1978 3253 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-01 Kick 650.00 650.00
2014-10-04 Kick 20.00 20.00
2015-02-23 No Incident Encountered 0.00 0.00
2015-03-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References