If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014110211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.009837,"lon":-111.380302,"icon":""}]} |
Location: 00/11-02-001-11W4/0 | |
Location Alias: 00/11-02-01-11 W4M | |
Location Alias 2: 00/11-02-001-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 11 | |
Section: 02 | |
County/Municipality: County of Warner No. 5 | |
Well Name: FULCO CONLEY KNAPPEN 11-2-1-11 | |
Operator Name: Fulton Producing Company | |
License Number: 0044105 | |
License Date: 1972-11-09 | |
License Status: RecCertified | |
Spud Date: 1972-11-08 | |
Final Drill Date: 1972-11-11 | |
Well Total Depth: 844.30 m | |
Surface Hole Latitude: 49.009837 | |
Surface Hole Longitude: -111.380302 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-11-09 | Obtained License |
1972-11-11 | Finished Drilling |
1972-11-12 | Production Casing Operation Performed |
1972-11-30 | Well Mode changed to Drilled and Cased |
1974-09-19 | Perforation Treatment Performed - Jet Perforation |
1974-09-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-09-22 | Perforation Treatment Performed - Jet Perforation |
1975-07-10 | Well Began Production |
1975-07-10 | Well Fluid changed to Gas |
1975-07-10 | Well Mode changed to Flowing |
1991-04-15 | Well Fluid changed to Gas |
1991-04-15 | Well Mode changed to Closed |
1995-07-11 | Well Fluid changed to Gas |
1995-07-11 | Well Mode changed to Closed |
1995-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-09-26 | Plug Back Performed |
1995-09-26 | Well Abandoned |
1995-09-26 | Well Fluid changed to Gas |
1995-09-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-09-19 | Perforation | 830.90 | 832.70 | 13 |
1974-09-21 | Packing Device Capped w/Cement | 824.50 | 829.10 | 0 |
1974-09-22 | Perforation | 811.40 | 813.20 | 13 |
1995-09-26 | Packing Device Capped w/Cement | 792.00 | 800.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 3582 | 0.0 | 0.0 | 0.0 |
1976 | 7245 | 0.0 | 0.0 | 0.0 |
1977 | 2691 | 0.0 | 0.0 | 0.0 |
1978 | 6976 | 0.0 | 0.0 | 0.0 |
1979 | 8449 | 0.0 | 0.0 | 0.0 |
1980 | 6101 | 0.0 | 0.0 | 0.0 |
1981 | 5159 | 0.0 | 0.0 | 0.0 |
1983 | 3343 | 0.0 | 0.0 | 0.0 |
1984 | 2548 | 0.0 | 0.0 | 0.0 |
1985 | 3402 | 0.0 | 0.0 | 0.0 |
1986 | 2687 | 0.0 | 0.0 | 0.0 |
1987 | 2806 | 0.0 | 0.0 | 0.0 |
1988 | 3711 | 0.0 | 0.0 | 0.0 |
1989 | 4019 | 0.0 | 0.0 | 0.0 |
1990 | 1291 | 0.0 | 0.0 | 0.0 |
For data sources see[5]