X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014092406022

Well Details

Well ID: 0014092406022
Loading map...
Location: 02/06-24-001-09W4/2
Location Alias: 02/06-24-01-09 W4M
Location Alias 2: 02/06-24-001-09 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 24
County/Municipality: County of Forty Mile No. 8
Well Name: CVE 102 ADEN 6-24-1-9
Operator Name: Cenovus Energy Inc.
License Number: 0231538
License Date: 1999-12-29
License Status: RecCertified
Spud Date: 2000-01-05
Final Drill Date: 2000-01-06
Well Total Depth: 683.00 m
Surface Hole Latitude: 49.048919
Surface Hole Longitude: -111.090991

For data sources see[1][2]

Well History

Date Event
1999-12-29 Obtained License
2000-01-05 Surface Casing Operation Performed
2000-01-06 Finished Drilling
2000-01-06 Production Casing Operation Performed
2000-01-06 Rig Released
2000-01-06 Well Mode changed to Drilled and Cased
2000-01-18 Well Log Performed
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-29 Plug Back Performed
2000-04-30 Perforation Treatment Performed - Jet Perforation
2000-04-30 Well Mode changed to Drilled and Cased
2003-05-29 Perforation Treatment Performed - Jet Perforation
2003-06-06 Perforation Treatment Performed - Fractured
2003-06-16 Well Log Performed
2003-06-17 Perforation Treatment Performed - Fractured
2004-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-24 Plug Back Performed
2004-02-24 Well Abandoned
2004-02-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-12 Perforation 586.00 590.00 7
2000-04-29 Packing Device Capped w/Cement 572.00 580.00 0
2000-04-30 Perforation 383.00 387.00 13
2003-05-29 Perforation 586.00 590.00 7
2003-06-06 Fracture 586.00 590.00 0
2003-06-17 Fracture 383.00 387.00 0
2004-02-19 Packing Device Capped w/Cement 569.00 577.00 0
2004-02-24 Packing Device Capped w/Cement 361.00 369.00 0

For data sources see[4]



References