If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014091006032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.017583,"lon":-111.135455,"icon":""}]} |
Location: 03/06-10-001-09W4/2 | |
Location Alias: 03/06-10-01-09 W4M | |
Location Alias 2: 03/06-10-001-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 001 | |
Meridian: 4 | |
Range: 09 | |
Section: 10 | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF ADEN 6-10-1-9 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0048015 | |
License Date: 1973-11-14 | |
License Status: Issued | |
Spud Date: 1974-01-22 | |
Final Drill Date: 1974-01-26 | |
Well Total Depth: 830.00 m | |
Surface Hole Latitude: 49.017583 | |
Surface Hole Longitude: -111.135455 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-11-14 | Obtained License |
1974-01-26 | Finished Drilling |
1974-01-26 | Well Mode changed to Drilled and Cased |
1974-01-27 | Kick Occurred |
1974-02-04 | Production Casing Operation Performed |
1974-03-05 | Perforation Treatment Performed - Open-Hole Completion |
2002-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-08-20 | Perforation Treatment Performed - Jet Perforation |
2002-08-20 | Plug Back Performed |
2002-08-21 | Well Log Performed |
2002-09-12 | Well Began Production |
2002-09-12 | Well Fluid changed to Gas |
2002-09-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-03-05 | Open Hole/Barefoot Completion | 823.90 | 830.00 | 0 |
2002-08-20 | Packing Device Capped w/Cement | 805.00 | 813.00 | 0 |
2002-08-20 | Perforation | 770.50 | 773.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 2660 | 0.0 | 0.0 | 0.0 |
2003 | 8743 | 0.0 | 0.0 | 0.0 |
2004 | 8560 | 0.0 | 0.0 | 0.0 |
2005 | 8591 | 0.0 | 0.0 | 0.0 |
2006 | 8672 | 0.0 | 0.0 | 0.0 |
2007 | 7820 | 0.0 | 0.0 | 0.0 |
2008 | 8730 | 0.0 | 0.0 | 0.0 |
2009 | 8227 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8548 | 0.0 | 0.0 | 0.0 |
2012 | 8759 | 0.0 | 0.0 | 0.0 |
2013 | 6539 | 0.0 | 0.0 | 0.0 |
2014 | 6765 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8639 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1974-01-27 | Kick | 830.00 | 830.00 |
For data sources see[6]