X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014091006030

Well Details

Well ID: 0014091006030
Loading map...
Location: 03/06-10-001-09W4/0
Location Alias: 03/06-10-01-09 W4M
Location Alias 2: 03/06-10-001-09 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 10
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 6-10-1-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0048015
License Date: 1973-11-14
License Status: Issued
Spud Date: 1974-01-22
Final Drill Date: 1974-01-26
Well Total Depth: 830.00 m
Surface Hole Latitude: 49.017583
Surface Hole Longitude: -111.135455

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-11-14 Obtained License
1974-01-26 Finished Drilling
1974-01-26 Well Mode changed to Drilled and Cased
1974-01-27 Kick Occurred
1974-02-04 Production Casing Operation Performed
1974-03-05 Perforation Treatment Performed - Open-Hole Completion
1974-07-18 Well Began Production
1974-07-18 Well Fluid changed to Gas
1974-07-18 Well Mode changed to Flowing
1976-11-09 Well Fluid changed to Gas
1976-11-09 Well Mode changed to Suspended
1985-02-01 Well Fluid changed to Gas
1985-02-01 Well Mode changed to Flowing
1985-04-03 Well Fluid changed to Gas
1985-04-03 Well Mode changed to Suspended
1988-09-01 Well Fluid changed to Gas
1988-09-01 Well Mode changed to Flowing
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Suspended
2001-05-15 Well Fluid changed to Gas
2001-05-15 Well Mode changed to Flowing
2002-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-20 Perforation Treatment Performed - Jet Perforation
2002-08-20 Plug Back Performed
2002-08-20 Well Fluid changed to Gas
2002-08-20 Well Mode changed to Abandoned Zone
2002-08-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-05 Open Hole/Barefoot Completion 823.90 830.00 0
2002-08-20 Packing Device Capped w/Cement 805.00 813.00 0
2002-08-20 Perforation 770.50 773.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 2606 0.0 0.0 0.0
1975 138 0.0 0.0 0.0
1976 21 0.0 0.0 0.0
1985 398 0.0 0.0 0.0
1986 303 0.0 0.0 0.0
1988 289 0.0 0.0 0.0
1991 377 0.0 0.0 0.0
1992 3373 0.0 0.0 0.0
1993 2050 0.0 0.0 0.0
1994 5831 0.0 0.0 0.0
1995 7882 0.0 0.0 0.0
1996 706 0.0 0.0 0.0
1997 6888 0.0 0.0 0.0
1998 2879 0.0 0.0 0.0
2001 2947 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-01-27 Kick 830.00 830.00

For data sources see[6]

References