X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014091006022

Well Details

Well ID: 0014091006022
Loading map...
Location: 02/06-10-001-09W4/2
Location Alias: 02/06-10-01-09 W4M
Location Alias 2: 02/06-10-001-09 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 10
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 6-10-1-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0034168
License Date: 1968-05-28
License Status: Issued
Spud Date: 1968-07-26
Final Drill Date: 1968-07-29
Well Total Depth: 702.00 m
Surface Hole Latitude: 49.019037
Surface Hole Longitude: -111.133374

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-05-28 Obtained License
1968-07-29 Drill Stem Test Performed
1968-07-29 Finished Drilling
1968-07-29 Well Mode changed to Drilled and Cased
1968-07-30 Production Casing Operation Performed
1968-08-08 Perforation Treatment Performed - Jet Perforation
1970-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-10-06 Perforation Treatment Performed - Jet Perforation
1971-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-02-23 Plug Back Performed
1971-03-08 Well Began Production
1971-03-08 Well Fluid changed to Gas
1971-03-08 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1983-07-16 Well Fluid changed to Gas
1983-07-16 Well Mode changed to Flowing
2002-08-22 Perforation Treatment Performed - Jet Perforation
2002-08-22 Well Log Performed
2011-03-04 Perforation Treatment Performed - Jet Perforation
2011-03-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-08 Perforation 635.20 637.00 13
2011-03-04 Perforation 534.50 537.50 17
1970-10-05 Packing Device Capped w/Cement 629.40 629.40 0
1970-10-06 Perforation 606.90 609.90 10
1970-10-06 Perforation 575.20 579.10 10
1970-10-06 Perforation 551.10 557.20 10
1971-02-23 Packing Device Capped w/Cement 586.40 594.40 0
1971-02-23 Packing Device Capped w/Cement 565.00 573.00 0
2002-08-22 Perforation 551.10 557.10 17
2011-03-04 Perforation 540.50 544.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 0 0.0 0.0 0.0
1972 6967 0.0 0.0 0.0
1973 7162 0.0 0.0 0.0
1974 7548 0.0 0.0 0.0
1975 4110 0.0 0.0 0.0
1976 6091 0.0 0.0 0.0
1977 7642 0.0 0.0 0.0
1978 3553 0.0 0.0 0.0
1979 4468 0.0 0.0 0.0
1980 5064 0.0 0.0 0.0
1981 3980 0.0 0.0 0.0
1983 3877 0.0 0.0 0.0
1984 8707 0.0 0.0 0.0
1985 7994 0.0 0.0 0.0
1986 8063 0.0 0.0 0.0
1987 4813 0.0 0.0 0.0
1988 3145 0.0 0.0 0.0
1989 7817 0.0 0.0 0.0
1990 6860 0.0 0.0 0.0
1991 7608 0.0 0.0 0.0
1992 6833 0.0 0.0 0.0
1993 8392 0.0 0.0 0.0
1994 6533 0.0 0.0 0.0
1995 8333 0.0 0.0 0.0
1996 7766 0.0 0.0 0.0
1997 8380 0.0 0.0 0.0
1998 8536 0.0 0.0 0.0
1999 8580 0.0 0.0 0.0
2000 8646 0.0 0.0 0.0
2001 8677 0.0 0.0 0.0
2002 7902 0.0 0.0 0.0
2003 8150 0.0 0.0 0.0
2004 8600 0.0 0.0 0.0
2005 8702 0.0 0.0 0.0
2006 8709 0.0 0.0 0.0
2007 8586 0.0 0.0 0.0
2008 8761 0.0 0.0 0.0
2009 8179 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 7564 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8387 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References