X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0014091006003"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0014091006003
 
| Well ID: 0014091006003
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.019174, -111.13304 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.019174, -111.133040 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-10-001-09W4/3
 
| Location: 00/06-10-001-09W4/3
Line 43: Line 43:
 
| Surface Hole Latitude: 49.019174
 
| Surface Hole Latitude: 49.019174
 
|-
 
|-
| Surface Hole Longitude: -111.13304
+
| Surface Hole Longitude: -111.133040
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 189: Line 189:
 
| style="text-align: right;" | 777.20
 
| style="text-align: right;" | 777.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1979-08-31
 +
| Acid Treatment
 +
| style="text-align: right;" | 635.20
 +
| style="text-align: right;" | 636.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-09-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 624.00
 +
| style="text-align: right;" | 632.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-30
 
| 1961-09-30
Line 237: Line 249:
 
| style="text-align: right;" | 636.40
 
| style="text-align: right;" | 636.40
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 10
|-
 
| 1979-08-31
 
| Acid Treatment
 
| style="text-align: right;" | 635.20
 
| style="text-align: right;" | 636.40
 
| style="text-align: right;" | 0
 
|-
 
| 1994-09-30
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 624.00
 
| style="text-align: right;" | 632.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 330: Line 330:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:20, 17 January 2021

Well Details

Well ID: 0014091006003
Loading map...
Location: 00/06-10-001-09W4/3
Location Alias: 00/06-10-01-09 W4M
Location Alias 2: 00/06-10-001-09 W4/03
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 09
Section: 10
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 6-10-1-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0020802
License Date: 1961-05-26
License Status: Abandoned
Spud Date: 1961-06-07
Final Drill Date: 1961-06-23
Well Total Depth: 905.30 m
Surface Hole Latitude: 49.019174
Surface Hole Longitude: -111.133040

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-26 Obtained License
1961-06-15 Drill Stem Test Performed
1961-06-16 Drill Stem Test Performed
1961-06-17 Drill Stem Test Performed
1961-06-21 Drill Stem Test Performed
1961-06-22 Drill Stem Test Performed
1961-06-23 Finished Drilling
1961-06-23 Production Casing Operation Performed
1961-06-23 Well Mode changed to Drilled and Cased
1961-09-30 Perforation Treatment Performed - Jet Perforation
1961-10-01 Perforation Treatment Performed - Jet Perforation
1961-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-02 Perforation Treatment Performed - Jet Perforation
1973-04-03 Perforation Treatment Performed - Cement Plug
1979-08-28 Perforation Treatment Performed - Cement Plug
1979-08-30 Perforation Treatment Performed - Jet Perforation
1979-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-03 Well Began Production
1979-09-03 Well Fluid changed to Crude Oil
1979-09-03 Well Mode changed to Flowing
1980-03-26 Well Fluid changed to Crude Oil
1980-03-26 Well Mode changed to Pumping
1980-08-16 Well Fluid changed to Crude Oil
1980-08-16 Well Mode changed to Suspended
1994-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-30 Plug Back Performed
1994-09-30 Well Fluid changed to Crude Oil
1994-09-30 Well Mode changed to Abandoned
1994-10-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-30 Perforation 776.30 777.20 13
1979-08-31 Acid Treatment 635.20 636.40 0
1994-09-30 Packing Device Capped w/Cement 624.00 632.00 0
1961-09-30 Perforation 780.00 783.00 13
1961-10-01 Perforation 880.90 883.90 13
1961-10-01 Perforation 885.70 888.20 13
1961-10-02 Acid Treatment 880.90 888.20 0
1961-10-02 Perforation 857.40 862.00 13
1973-04-03 Cement Plug 865.60 905.30 0
1979-08-28 Cement Plug 722.40 841.20 0
1979-08-30 Perforation 635.20 636.40 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2808 0.0 0.0 0.0
1980 2461 0.0 0.0 0.0

For data sources see[5]

References