If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0014090416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.010866,"lon":-111.145928,"icon":""}]} |
Location: 00/16-04-001-09W4/0 | |
Location Alias: 00/16-04-01-09 W4M | |
Location Alias 2: 00/16-04-001-09 W4/00 | |
Province: Alberta | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: PINE CLIFF ADEN 16-4-1-9 | |
Operator Name: | |
License Number: 0123949 | |
License Date: 1986-09-18 | |
License Status: Issued | |
Spud Date: 1986-10-02 | |
Final Drill Date: 1986-10-07 | |
Well Total Depth: 928 m | |
Surface Hole Latitude: 49.010866 | |
Surface Hole Longitude: -111.145928 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-11-05 | Perforation | 846 | 850 | 13 |
1987-01-11 | Perforation | 858 | 859 | 13 |
1987-01-12 | Perforation | 860 | 861 | 13 |
1987-01-13 | Acid Treatment | 858 | 861 | 0 |
1987-01-14 | Perforation | 595.7 | 597 | 13 |
1987-01-15 | Perforation | 563 | 564 | 13 |
2002-08-27 | Acid Treatment | 846 | 861 | 0 |
2005-02-22 | Acid Treatment | 846 | 861 | 0 |
2011-03-09 | Packing Device Capped w/Cement | 825 | 833 | 0 |
2011-03-10 | Perforation | 540 | 543 | 20 |
2011-03-10 | Perforation | 534 | 537.5 | 20 |
2011-03-10 | Perforation | 528 | 530 | 20 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 1310 | 229.7 | 0.0 | 0.0 |
1988 | 7494 | 1798.3 | 0.0 | 2.1 |
1989 | 5658 | 1835.0 | 0.0 | 3.3 |
1990 | 5787 | 3509.0 | 0.0 | 21.5 |
1991 | 6041 | 4013.7 | 0.0 | 27.0 |
1992 | 2934 | 1758.4 | 0.0 | 14.7 |
1993 | 4723 | 2510.1 | 0.0 | 198.9 |
1994 | 4735 | 2437.9 | 0.0 | 225.1 |
1995 | 7237 | 3341.1 | 0.0 | 204.9 |
1996 | 7295 | 3511.5 | 0.0 | 159.9 |
1997 | 7693 | 3265.5 | 0.0 | 183.7 |
1998 | 8024 | 5053.1 | 0.0 | 326.6 |
1999 | 8735 | 5108.9 | 0.0 | 382.5 |
2000 | 8206 | 4791.6 | 0.0 | 367.0 |
2001 | 8723 | 4636.6 | 0.0 | 324.9 |
2002 | 8458 | 4165.4 | 0.0 | 140.5 |
2003 | 8590 | 5192.4 | 0.0 | 61.0 |
2004 | 8263 | 3018.7 | 0.0 | 130.6 |
2005 | 8488 | 2081.6 | 0.0 | 291.6 |
2006 | 8262 | 1452.0 | 0.0 | 399.4 |
2007 | 7164 | 944.6 | 0.0 | 148.0 |
2008 | 744 | 6.2 | 0.0 | 0.0 |
For data sources see[4]