X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0014082001000"

m
m
 
Line 348: Line 348:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:19, 17 January 2021

Well Details

Well ID: 0014082001000
Loading map...
Location: 00/01-20-001-08W4/0
Location Alias: 00/01-20-01-08 W4M
Location Alias 2: 00/01-20-001-08 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 20
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 1-20-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0271569
License Date: 2002-07-05
License Status: Issued
Spud Date: 2002-07-16
Final Drill Date: 2002-07-21
Well Total Depth: 601.00 m
Surface Hole Latitude: 49.043293
Surface Hole Longitude: -111.034745

For data sources see[1][2]

Well History

Date Event
2002-07-05 Obtained License
2002-07-16 Surface Casing Operation Performed
2002-07-21 Finished Drilling
2002-07-21 Production Casing Operation Performed
2002-07-21 Rig Released
2002-07-21 Well Mode changed to Drilled and Cased
2002-07-23 Well Log Performed
2002-08-01 Perforation Treatment Performed - Jet Perforation
2002-08-01 Well Log Performed
2002-08-19 Perforation Treatment Performed - Fractured
2002-09-01 Perforation Treatment Performed - Jet Perforation
2002-09-01 Well Log Performed
2002-09-12 Perforation Treatment Performed - Fractured
2002-12-05 Well Began Production
2002-12-05 Well Fluid changed to Gas
2002-12-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-01 Perforation 552.00 555.00 13
2002-08-19 Fracture 552.00 555.00 0
2002-09-01 Perforation 346.50 350.50 13
2002-09-12 Fracture 346.50 350.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 744 0.0 0.0 0.0
2003 3622 0.0 0.0 0.0
2004 8705 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 8367 0.0 0.0 0.0
2007 8629 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8371 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8027 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References