X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014081711000

Well Details

Well ID: 0014081711000
Loading map...
Location: 00/11-17-001-08W4/0
Location Alias: 00/11-17-01-08 W4M
Location Alias 2: 00/11-17-001-08 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 11-17-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0018909
License Date: 1960-04-06
License Status: Issued
Spud Date: 1960-04-17
Final Drill Date: 1960-04-21
Well Total Depth: 810.80 m
Surface Hole Latitude: 49.037832
Surface Hole Longitude: -111.044022

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-04-06 Obtained License
1960-04-21 Finished Drilling
1960-04-23 Production Casing Operation Performed
1960-05-22 Drill Stem Test Performed
1960-07-29 Perforation Treatment Performed - Jet Perforation
1960-07-31 Perforation Treatment Performed - Jet Perforation
1960-07-31 Well Mode changed to Drilled and Cased
1960-10-05 Well Began Production
1960-10-05 Well Fluid changed to Gas
1960-10-05 Well Mode changed to Flowing
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1984-01-01 Well Fluid changed to Gas
1984-01-01 Well Mode changed to Flowing
2001-07-01 Well Fluid changed to Gas
2001-07-01 Well Mode changed to Suspended
2002-08-19 Perforation Treatment Performed - Jet Perforation
2002-08-20 Well Log Performed
2009-01-20 Well Fluid changed to Gas
2009-01-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-29 Perforation 670.30 671.80 13
1960-07-29 Perforation 648.60 650.10 13
1960-07-31 Perforation 765.00 766.60 13
1960-07-31 Perforation 772.40 773.90 13
2002-08-19 Perforation 772.40 775.40 14
2002-08-19 Perforation 764.70 768.70 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1460 0.0 0.0 0.0
1969 7878 0.0 0.0 0.0
1970 6782 0.0 0.0 0.0
1971 6868 0.0 0.0 0.0
1972 8656 0.0 0.0 0.0
1973 7545 0.0 0.0 0.0
1974 7552 0.0 0.0 0.0
1975 4109 0.0 0.0 0.0
1976 5764 0.0 0.0 0.0
1977 7478 0.0 0.0 0.0
1978 3559 0.0 0.0 0.0
1979 8450 0.0 0.0 0.0
1980 5190 0.0 0.0 0.0
1981 2353 0.0 0.0 0.0
1983 1027 0.0 0.0 0.0
1984 8480 0.0 0.0 0.0
1985 8204 0.0 0.0 0.0
1986 8056 0.0 0.0 0.0
1987 5764 0.0 0.0 0.0
1988 4584 0.0 0.0 0.0
1989 7872 0.0 0.0 0.0
1990 7840 0.0 0.0 0.0
1991 7958 0.0 0.0 0.0
1992 6534 0.0 0.0 0.0
1993 8177 0.0 0.0 0.0
1994 6407 0.0 0.0 0.0
1995 8276 0.0 0.0 0.0
1996 7521 0.0 0.0 0.0
1997 8162 0.0 0.0 0.0
1998 8727 0.0 0.0 0.0
1999 8758 0.0 0.0 0.0
2000 4437 0.0 0.0 0.0
2001 1360 0.0 0.0 0.0
2009 4871 0.0 0.0 0.0
2010 7799 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 6719 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References