X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0014081705000"

m
m
 
Line 540: Line 540:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:18, 17 January 2021

Well Details

Well ID: 0014081705000
Loading map...
Location: 00/05-17-001-08W4/0
Location Alias: 00/05-17-01-08 W4M
Location Alias 2: 00/05-17-001-08 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 17
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 5-17-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: B0001902
License Date: 1947-09-18
License Status: Issued
Spud Date: 1947-09-29
Final Drill Date: 1947-10-31
Well Total Depth: 1023.50 m
Surface Hole Latitude: 49.033883
Surface Hole Longitude: -111.049187

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-09-18 Obtained License
1947-10-21 Drill Stem Test Performed
1947-10-31 Finished Drilling
1947-11-01 Production Casing Operation Performed
1951-11-27 Perforation Treatment Performed - Bullet Perforation
1951-11-27 Well Mode changed to Drilled and Cased
1952-02-08 Well Began Production
1952-02-08 Well Fluid changed to Gas
1952-02-08 Well Mode changed to Flowing
1960-07-29 Perforation Treatment Performed - Jet Perforation
1960-07-29 Well Fluid changed to Gas
1960-07-29 Well Mode changed to Flowing
1961-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-22 Well Fluid changed to Gas
1979-03-22 Well Mode changed to Suspended
1986-02-20 Well Fluid changed to Gas
1986-02-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-27 Bullet Perforation 895.80 901.90 10
1960-07-29 Perforation 976.30 979.30 7
1961-10-12 Acid Treatment 976.30 979.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1454 0.0 0.0 0.0
1969 7696 0.0 0.0 0.0
1970 6866 0.0 0.0 0.0
1971 6873 0.0 0.0 0.0
1972 8655 0.0 0.0 0.0
1973 7641 0.0 0.0 0.0
1974 7453 0.0 0.0 0.0
1975 4214 0.0 0.0 0.0
1976 773 0.0 0.0 0.0
1986 7036 0.0 0.0 0.0
1987 5871 0.0 0.0 0.0
1988 3245 0.0 0.0 0.0
1989 7766 0.0 0.0 0.0
1990 7895 0.0 0.0 0.0
1991 8157 0.0 0.0 0.0
1992 6199 0.0 0.0 0.0
1993 8292 0.0 0.0 0.0
1994 6517 0.0 0.0 0.0
1995 8497 0.0 0.0 0.0
1996 7155 0.0 0.0 0.0
1997 8427 0.0 0.0 0.0
1998 8749 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8710 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 8413 0.0 0.0 0.0
2004 8411 0.0 0.0 0.0
2005 8342 0.0 0.0 0.0
2006 8561 0.0 0.0 0.0
2007 8405 0.0 0.0 0.0
2008 8563 0.0 0.0 0.0
2009 8347 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8548 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 7739 0.0 0.0 0.0
2014 8732 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7176 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References