X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014080905000

Well Details

Well ID: 0014080905000
Loading map...
Location: 00/05-09-001-08W4/0
Location Alias: 00/05-09-01-08 W4M
Location Alias 2: 00/05-09-001-08 W4/00
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 09
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 5-9-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0271990
License Date: 2002-07-22
License Status: Abandoned
Spud Date: 2002-08-26
Final Drill Date: 2002-11-02
Well Total Depth: 607.00 m
Surface Hole Latitude: 49.017973
Surface Hole Longitude: -111.024692

For data sources see[1][2]

Well History

Date Event
2002-07-22 Obtained License
2002-08-26 Conductor Casing Operation Performed
2002-08-27 Production Casing Operation Performed
2002-08-27 Well Mode changed to Drilled and Cased
2002-09-04 Well Log Performed
2002-11-02 Finished Drilling
2002-11-02 Perforation Treatment Performed - Open-Hole Completion
2002-11-02 Rig Released
2002-11-05 Well Fluid changed to Gas
2002-11-05 Well Mode changed to Testing
2002-11-16 Well Log Performed
2002-11-28 Well Log Performed
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-02 Well Log Performed
2002-12-17 Perforation Treatment Performed - Fractured
2003-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-18 Perforation Treatment Performed - Jet Perforation
2003-02-18 Plug Back Performed
2003-02-18 Well Log Performed
2003-02-18 Well Mode changed to Abandoned Zone
2017-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-08 Plug Back Performed
2018-10-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-02 Open Hole/Barefoot Completion 590.50 607.00 0
2002-12-02 Perforation 456.00 459.00 13
2002-12-02 Perforation 442.00 445.00 13
2002-12-17 Fracture 442.00 459.00 0
2003-02-18 Packing Device Capped w/Cement 465.00 473.00 0
2003-02-18 Perforation 397.00 400.00 14
2017-11-08 Packing Device Capped w/Cement 384.00 392.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References