X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0014080811002

Well Details

Well ID: 0014080811002
Loading map...
Location: 00/11-08-001-08W4/2
Location Alias: 00/11-08-01-08 W4M
Location Alias 2: 00/11-08-001-08 W4/02
Country: Canada
Province: Alberta
Township: 001
Meridian: 4
Range: 08
Section: 08
County/Municipality: County of Forty Mile No. 8
Well Name: PINE CLIFF ADEN 11-8-1-8
Operator Name: Pine Cliff Energy Ltd.
License Number: 0018792
License Date: 1960-03-01
License Status: Issued
Spud Date: 1960-03-28
Final Drill Date: 1960-04-07
Well Total Depth: 1017.40 m
Surface Hole Latitude: 49.022863
Surface Hole Longitude: -111.043678

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-01 Obtained License
1960-04-01 Drill Stem Test Performed
1960-04-02 Drill Stem Test Performed
1960-04-03 Drill Stem Test Performed
1960-04-07 Drill Stem Test Performed
1960-04-07 Finished Drilling
1960-04-08 Drill Stem Test Performed
1960-04-09 Drill Stem Test Performed
1960-04-10 Production Casing Operation Performed
1960-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-07-21 Perforation Treatment Performed - Jet Perforation
1960-07-24 Perforation Treatment Performed - Jet Perforation
1960-07-27 Perforation Treatment Performed - Jet Perforation
1960-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-08 Perforation Treatment Performed - Jet Perforation
1960-08-29 Well Mode changed to Drilled and Cased
1961-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-03 Well Began Production
1962-01-03 Well Fluid changed to Gas
1962-01-03 Well Mode changed to Flowing
1964-11-01 Perforation Treatment Performed - Cement Plug
1964-11-01 Well Fluid changed to Gas
1964-11-01 Well Mode changed to Abandoned Zone
1964-11-02 Perforation Treatment Performed - Jet Perforation
2009-07-11 Well Log Performed
2009-08-20 Perforation Treatment Performed - Jet Perforation
2009-09-01 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-21 Packing Device Capped w/Cement 1007.40 1007.40 0
1960-07-21 Perforation 884.80 886.40 13
1960-07-21 Perforation 893.10 894.60 13
1960-07-24 Perforation 988.80 991.80 7
1960-07-27 Perforation 991.80 993.30 13
1960-07-31 Acid Treatment 988.80 993.30 0
1960-08-08 Perforation 993.30 996.40 13
1961-10-12 Acid Treatment 988.80 993.30 0
1964-11-01 Cement Plug 952.20 981.50 0
1964-11-02 Perforation 763.50 765.00 13
1964-11-02 Perforation 890.00 891.50 13
1964-11-02 Perforation 904.00 906.50 13
2009-08-20 Perforation 527.00 532.00 23
2009-09-01 Fracture 527.00 532.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References